My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41796
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41796
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:10:07 PM
Creation date
11/23/2007 11:24:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
General Documents
Doc Date
7/20/1990
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section II: Status of Stipulations <br />Stipulation No. 1: <br />BLUE RIBBON COAL COMPANY SHALL PROVIDE A MAP WHICH SPECIFICALLY INDICATES <br />THOSE INTERVALS OF THE HAUL ROAD CUT SLOPES WHICH EXPOSE GREATER THAN <br />10.5 FEET OF COLLUVIUM. IN ADDITION, CUT SLOPES ON THE HAUL ROAD WHICH <br />HAVE HAD VISUALLY PERCEPTIBLE MOVEMENT AT THE DATE OF PERMIT ISSUANCE <br />WILL BE INDICATED ON THE MAP. FOR BOTH AREAS SPECIFIED ON THE MAP AS <br />EITHER GREATER THAN 10.5 FEET OF COLLUVIAL MATERIAL IN THE HAUL ROAD CUT <br />SLOPES OR EXISTING MOVEMENT ZONES, BLUE RIBBON COAL COMPANY SHALL COMPLY <br />WITH RECOMMENDATIONS PERTAINING TO REQUIRED SLOPE TREATMENT INCLUDED IN <br />THE FORTHCOMING HAUL ROAD STUDY. THE REQUIRED FIELD WORK, THE <br />ABOVE-MENTIONED MAP, AND A REPORT DEFINING CORRECTIVE MEASURES, IF SLOPE <br />TREATMENT IS REQUIRED, SHALL BE SUBMITTED TO THE DIVISION FOR APPROVAL <br />WITHIN 30 DAYS OF PERMIT ISSUANCE. <br />Status: Complied With. <br />Stipulation No. 2: <br />BLUE RIBBON COAL COMPANY SHALL REVISE EXHIBIT F OR OTHERWISE AMEND THE <br />PERMIT APPLICATION TO ENSURE PROTECTION OF ESTABLISHED RIPARIAN <br />VEGETATION ADJACENT TO POND 1. A REVISED EXHIBIT F OR OTHER AMENDMENT <br />DEMONSTRATING PROTECTION OF THE RIPARIAN HABITAT MUST BE SUBMITTED TO THE <br />DIVISION WITHIN 30 DAYS OF PERMIT ISSUANCE. <br />Status: Forgiven. <br />Stipulation No. 3: <br />BLUE RIBBON COAL COMPANY SHALL PROVIDE AN ACCEPTABLE STABILITY ANALYSIS <br />OF THE PROPOSED BACK FILLED CONFIGURATION OF ALL MINE FACILITIES AND THE <br />HAUL ROAD, INCLUDING AN APPROPRIATE MATERIAL SHEAR STRENGTH TESTING <br />REPORT. THIS STABILITY ANALYSIS SHALL DEMONSTRATE COMPLIANCE WITH THE <br />STATIC SLOPE SAFETY FACTOR REQUIREMENTS OF RULE 4.27.4(1). THIS <br />ACCEPTABLE STABILITY ANALYSIS SHALL BE SUBMITTED TO THE DIVISION WITHIN <br />60 DAYS OF PERMIT ISSUANCE. <br />Status: Complied With. <br />Stipulation No. 4: <br />NO CONSTRUCTION (OF THE MINE BENCH) SHALL COMMENCE UNTIL FINAL <br />CONSTRUCTION DRAWINGS HAVE BEEN REVIEWED AND APPROVED BY THE DIVISION. <br />Status: Complied With. <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.