Laserfiche WebLink
Stipulation No. 5: <br />THE APPLICANT SHALL SUBMIT AN ACCEPTABLE MONITORING PROGRAM TO THE <br />DIVISION WITHIN 30 DAYS FOLLOWING APPROVAL OF THE REVISION. THIS <br />MONITORING PROGRAM SHALL INCLUDE BOTH SLOPE STABILITY MONUMENTATION AND <br />THE INSTALLATION AND MONITORING OF WATER LEVEL PIEZOMETERS, IN ORDER TO <br />VERIFY THE PORTAL BENCH'S STABILITY. TWO PIEZOMETERS SHALL BE INSTALLED <br />IN THE BENCH SUBDRAIN TO ENABLE COLLECTION AND FULL ANALYSIS OF LEACHATE <br />QUALITY TWO TIMES PER YEAR. <br />Status: Complied With, <br />Summary: No stipulations exist which are outstanding or unfulfilled, <br />/ern <br />9175E <br />-5- <br />