Laserfiche WebLink
<br />19 1993 Vegetation Survey Approved 5/26/94 <br />20 Revise Subsidence Monitoring Denied 11/7/94 <br />21 Revise Subsidence Monitoring Plan Approved 1/3/95 <br />22 Clarify Subsidence Monitoring Approved 7/26/95 <br /> Minor Revision Summarv <br />NO. TOA1C Decision Date <br />11 Reinforce Flood Control Dike Approved 4/16/93 <br />12 interim Slide Control Measures Approved 4/24/93 <br />13 Revised Wording of Stipulation # 4 Approved 6/24/93 <br />14 Revise Gob Disposal Plan Approved 6/28/93 <br />15 Update Landowner Addresses Approved 8/25/93 <br />16 Topsoil Information Update Approved 10/1/93 <br />17 Mine Plan Change- B seam Approved 10/26/93 <br />18 Update Wildlife Information Approved 6/2/94 <br />19 Compliance with Stipulation 33 Approved 10/3/94 <br />Stipulation Summar <br />There were six stipulations attached to the Permit Revision No. 2. <br />Findings Document which was prepared on February 8, 1995. Those <br />stipulations are restated here along with their current status. <br />Stipulation No. 6 <br />The permittee will submit to the Division an Annual Hydrologic <br />Report. This report shall include an analysis of all hydrologic <br />data gathered during the year, and an assessment of the hydrologic <br />impacts of mining in the following year. This report shall assess <br />the impacts of mining on the quality and quantity of water in <br />surface streams, springs, ground water aquifers, mine inflow, and <br />mine discharges. <br />This stipulation is still active. <br />Stipulation No. 21 <br />Bear Coal Company shall monitor both the operational and reclaimed <br />configuration of the portal access road and portal facilities of <br />the No. 3 Mine. Monitoring shall continue on a semi-annual basis <br />until two years following completion of the reclamation of the <br />