My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41554
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:09:47 PM
Creation date
11/23/2007 11:15:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
12/1/1995
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />This revision can also incorporate concerns outlined in the <br />December 1, 1995 AHR letter from the Division to Bear Coal Company <br />and also include any changes to the text required as a result of <br />discussion in section V of this document pertaining to variances <br />from approximate original contour. <br />A final change that can be incorporated into this revision will be <br />to update Drawing 11-1 to correctly depict the culvert location for <br />drainage area # 1 just above the mine no. 3 portal. <br />This revision, along with any comments or responses pertaining to <br />or required by this review, shall be submitted by January 31, 1996. <br />III. Summary of Revisions and Stipulations <br />There have been two permit revisions, thirteen technical revisions <br />and nine minor revisions since the last permit renewal. A summary <br />of these permitting actions is listed below. <br />Permit Revision Summarv <br />NO. TOD1C Decision Date <br />1 Mine plan change to add additional Approved 4/29/94 <br />B-seam coal reserves <br />2 Mine plan change to add additional <br />B-seam coal reserves Approved 2/8/95 <br />Technical Revision Summarv <br />NO. Tonic <br />10 Pond # 3 removal and vegetation <br />sampling at Mines 1 and 2 <br />11 Bond Calculations for Stipulations <br />30 and 31 <br />12 Screening Plant installation <br />13 Temporary Gob Pile <br />14 Access Road Slide Repair <br />15 Pond # 4 Design Modification <br />16 Mine Plan Change <br />17 Incidental Boundary Change <br />18 Update Sediment Control Plan <br />Decision Date <br />Approved 4/9/93 <br />Approved 5/31/93 <br />Approved 4/23/93 <br />Approved 8/17/93 <br />Approved 8/31/93 <br />Approved 8/4/93 <br />Withdrawn 10/19/93 <br />Approved 2/23/94 <br />Approved 2/25/94 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.