My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL41554
DRMS
>
Back File Migration
>
General Documents
>
GENERAL41554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:09:47 PM
Creation date
11/23/2007 11:15:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
12/1/1995
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />portal access road and portal facility area. Results of the <br />monitoring shall be submitted to the Division within 30 days <br />following completion of each monitoring episode. <br />This stipulation is still active. <br />Stipulation No. 32 <br />The applicant shall continue to submit to the Division an annual <br />report of inflows, discharges and consumption of water within the <br />mine. Amine workings map, showing the source (fault, fracture, <br />etc.), quantity, duration and quality of inflows, shall only be <br />required if there are measurable inflows to the mine during the <br />year. Records of water discharged from, consumed in, and imported <br />to the mine will also be included. The above information will be <br />submitted regularly with the annual hydrology report. <br />This stipulation is still active. <br />Stipulation No. 33 <br />Bear Coal Company will, before initiation of mining permitted by <br />PR-O1 secure a signed Coal Lease agreement with ARCO granting Bear <br />Coal Company the right to mine coal in the B-seam in the E/2 SE/4 <br />of Section 18, T135, R90W of the 6th P.M. Right of entry onto the <br />surface overlying this area must also be obtained. <br />This stipulation has been complied with through the submission of <br />a signed Coal Lease Agreement with the Alantic Richfield Coal <br />Company. This information has been incorporated into the permit <br />application and can be found in Volume 4, Exhibit 1. <br />Stipulation No. 34 <br />The permittee will install a groundwater monitoring well downdip <br />from the mine workings and into the B-seam (between the fourth <br />north mains and the North Fork of the Gunnison River) for the <br />purposes of monitoring the potential effects of mining on the B- <br />seam aquifer. The final location and timing of installation will <br />be mutually agreed upon by the operator and the Division after <br />further field investigation, but installation shall occur no later <br />than August 31, 1995. Monitoring shall occur semi-annually for <br />field parameters and water level, and one full suite sample shall <br />be taken annually in the fall. The test parameters for the full <br />suite sample shall be the same as required for the alluvial wells <br />(table 4F) plus magnesium and SAR. <br />This stipulation has been complied with and is no longer active. <br />Upon further review, it was determined that any information <br />gathered from this well could be obtained from existing wells. In <br />addition, access to the proposed site was nearly impossible without <br />considerable additional disturbance. Therefore, the completion of <br />this well was deemed unnecessary. Details are provided in the <br />Division letter of November 20, 1995. <br />
The URL can be used to link to this page
Your browser does not support the video tag.