Laserfiche WebLink
FURTHER, NATIONAL KING COAL MUST PREPARE RN APPROPRIATE GEOTECHNICAL <br />AND STABILITY ANALYSIS OF TXE PROPOSED BRCKFILLED CONFIGURATIONS <br />FOR THE PORTAL BENCH AREAS AT THE KING COAL MINE. THESE ANALYSES <br />SHALL UTILIZE ACCEPTED SLOPE STABILITY MATHEMATICAL ANALYSIS TECH- <br />NIQUES, MATERIAL STRENGTH DETERMINATIONS AND APPROPRIATELY DETAILED <br />GEOTECHNICAL XNOWLEDGE OF TXE SITE, IN ORDER TO COMPLETE TXE <br />REQUIRED STABILITY DEMONSTRATION. R REPORT OF THIS REQUIRED <br />STABILITY ANALYSIS AND THE APPROPRIATE GEOTECHNICAL INVESTIGATIONS <br />OR OTHER INFORMATION ACCEPTABLE TO THE DIVISION DEMONSTRATING <br />STABILITY, SHALL BE SUBMITTED TO THE DIVISION FOR APPROVAL WITHIN <br />120 DAYS FOLLOWING ISSUANCE OF TXE APPROVED PERMIT. <br />