EXHIBIT "E" -RECLAMATION PLAN (Technical Revision 6-20-85, Page 4) <br />The outlet from the concrete batch plant, which was dispensing minute amounts <br />of water and creating an erosion gulley will be taken care of by constructing a <br />o~ttc% p~ ~~C(d ~ <br />drainage ditch to the settling ponds which is rock lined, for drainage to be contained <br />and so that this water can createno more gullies. <br />The present operator and the previous operator did pour waste concrete downslope <br />to stabilize various erosion gul5es. This practice will cease and the operator will build <br />a berm abng the top to stabilize these gullies by preventing water to progress over <br />~~ <br />~ti0 <br />,,~~pp""~~ the side of the mesa. thus the drainage plan will be utilized. <br />The natural gas line which was exposed in one of the erosion gullies will be <br />~~ ~, ~. <br />covered immediately and compacted with the surrounding material so thi t it will not <br />----~_ <br />,y be e.cposed. Also, a berm and concrete wall will be built on the top of the mesa so <br />~-~~+' that water from runoff will be channeled through a drainage ditch and will not be <br />. ~ allowed to drain through these gullies, but will be drained via the drainage plan as <br />_1 •p}/ outlined. <br />Where the underground irrigation pipe was broken, the operator constructed a <br />drainage ditch to the settling ponds in order to contain this runoff, the settling pond <br />~'~ is near the asphalt plant, since this is only periodical and the underground irrigation <br />is shut off, the majority of the time. This measure will prevent the water from <br />flowing down the road. <br />With a drainage ditch to the settling pond near the sump, there will be no more water <br />flowing down the road, over a gravel armoured retaing wall, o.r such, where some <br />fed into a pipe leading to a sump and some continued as overland flow. <br />Due to the drainage ditch to the settlement pond, no water will be allowed to <br />continue as overland flow, passing through asphalt issuing Erom a leak in the asphalt <br />plant retort (which the operator fixed immediately) and no erosion will be allow:;d, <br />