Laserfiche WebLink
EXHIBIT "E" - RECLAMATION PLAN (Technical Revision 6-20-85, Page 3) <br />The asphalt and concrete waste dumped in designated piles on the northern <br />boundary of phase two covers approximately a 1/4 acre area. The fill was necessary <br />to raise the elevation and level the area for a crusher and stockpile to be implemented <br />for use as the mining proceeded west. A 3 ft. high berm will be constructed to <br />~, prevent any further asphalt and concrete from being found downslope. <br />IIppAA--~The northern boundary of phase two is a gravel bar mesa, thus there was very <br />0"r' <br />little to no topsoil for salvage purposes. Therefore, the operator salvaged the <br />minimal amounts of topsoil available which was then placed in the current topsoil <br />stockpile. ~ ~ <br />Although the previous operator allowed edges of asphalt and covered slough onto <br />the Santa Fe Road, the present operator will implement a berm 3 ft. high along the <br />edges of the property, above the bluff for approximately 825 ft. to prevent any <br />~~ sloughing and also to control side erosion and a concrete wall along the parking <br />~~1,area for 495 ft. to also prevent sloughing and to be used to control side erosion. <br />t~~ ,~ The previous operator dumped concrete waste downslope along the northern <br />h~' boundary of phase two and the present operator has, in the past, only dumped for <br />the purposes of gulley erosion control. This practice will not be continued in the Euture. <br />Tops it was salvaged from the area, but due to the fact that the area is located <br />~{~~ <br />on a gravel bar mesa, very little to no topsoil was obtained. Any topsoil which was <br />salvaged was placed in the current topsoil stockpile. <br />The 30 automotive batteries have at this time been taken ofE-site and disposed of <br />off-site at the County dump. The liquid contained was transported off-site and disposed <br />of with the batteries. The salvage area (which covers less than L/4 acre) will be <br />~` cleaned up and left in a neat and workable condition with all materials to be used as <br />~~' -~ replacement parts for the mining machinery. <br />