Laserfiche WebLink
SECTION II - REVISIONS TO THE PERMIT <br />Subsequent to the permit renewal on January 7, 1988, P&M has submitted two <br />minor revisions, three technical revisions and one permit revision as follows: <br />- Minor Revision 24 was initiated as a Field Decision and approved on <br />July 6, 1988. It was for construction of a sump to the Center Ridge Pond <br />which would better facilitate sediment removal. <br />- Minor Revision 25 was submitted on November 17, 1989 and was approved on <br />November 30, 1989. This revision was for the removal of the custom coal <br />pile and grizzly to the scoria storage site. <br />- Technical Revision 14 was submitted on February 8, 1988 and was approved <br />on August 18, 1988. This revision changed mining limits at the <br />West Ridge to allow daylighting through the crest of the ridge. <br />- Technical Revision 15 was submitted January 27, 1988 and was approved <br />June 13, 1988 with stipulations. This revision dealt with reclamation of <br />the south of Shop Slide Area. <br />- Technical Revision 16 was submitted May 2, 1988 and was approved July 5, <br />1986. This revision was concerned with modification of the hydrologic <br />monitoring program. <br />- Permit Revision O1 was submitted November 2, 1989 for the modification of <br />the Moffat area mine plan. The Division is reviewing this submittal at <br />this time. <br />-3- <br />