Laserfiche WebLink
SECTION III - STATUS OF STIPULATIONS <br />The Settlement Agreement between P8M and the Division dated November 19, 1987 <br />reduced the list of stipulations to three. They are as follows: <br />Stipulation No. 1 <br />THE PERMITTEE MUST SUBMIT TO MLRD THE DESIGNS FOR THE MOFFAT AREA <br />SEDIMENT PONDS AT LEAST SIX MONTHS PRIOR TO CONSTRUCTION, AND RECEIVE <br />APPROVAL FOR THE PROPOSED DESIGN BEFORE COM1~ NCING CONSTRUCTION OF THE <br />PONDS OR MINING IN THE MOFFAT AREA. THESE DESIGNS WILL REFLECT CURRENT <br />REGULATORY DESIGN CRITERIA AND APPROVAL WILL BE CONTINGENT ON INFORMATION <br />DEMONSTRATING THAT THE PONDS OUTFLOW WILL MEET EFFLUENT LIMITATIONS. <br />Stipulation No. lc <br />THE APPLICANT SHALL SUBMIT DESIGN DATA FOR EACH OF THE MOFFAT AREA <br />SEDIMENTATION POND INFLOW DITCHES. THIS INFORMATION SHALL INCLUDE <br />EVIDENCE THAT DITCH SLOPES WILL PROVIDE POSITIVE DRAINAGE TO THE PONDS <br />WITH ACCEPTABLE VELOCITIES. THE INFORMATION SHOULD ALSO DEMONSTRATE THAT <br />BERMS TO BE CONSTRUCTED WILL NOT SIGNIFICANTLY IMPOUND WATER. <br />Stipulation No. 3 <br />PRIOR TO MINING IN THE MOFFAT AREA, THE APPLICANT SHALL DEMONSTRATE, <br />BASED UPON ON-THE-GROUND PERFORMANCE, THAT THE CONVEX LOWER SLOPES DO NOT <br />CAUSE EXCESSIVE RILLING AND GULLYING OR THAT RILLING AND GULLYING ON <br />THESE SLOPES CAN BE CONTROLLED. IF THE APPLICANT'S EFFORTS TO CONTROL <br />RILLING AND GULLYING IN THE AREAS RECLAIMED PROVE UNSUCCESSFUL, THE <br />APPLICANT WILL REDESIGN THE POSTMINING TOPOGRAPHY TO ELIMINATE THE <br />CONVEXITY FROM THE LOWER PORTIONS OF THE SLOPE. <br />The Division has received Permit Revision 1 (PR1) which addresses proposed <br />mining in the Moffat area. This revision submittal includes discussion on <br />sedimentation pond design (Stipulation No. 1) and the collection ditch system <br />(Stipulation No. lc). The concerns upon which Stipulation No. 3 was based <br />have been addressed in PR1. In this revision submittal mining will occur <br />updip in 100 foot wide pits. Subsequent back filling and grading plans <br />submitted appear to adequately answer Stipulation No. 3. <br />-4- <br />