My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL40216
DRMS
>
Back File Migration
>
General Documents
>
GENERAL40216
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:27 PM
Creation date
11/23/2007 10:33:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1985070
IBM Index Class Name
General Documents
Doc Date
4/20/2000
Doc Name
Bid Package for Bid PKA-0-1081
From
DMG
To
Interested Contractors
Permit Index Doc Type
Reclamation Project
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the CONTRACTOR shall provide the PROJECT MANAGER with a written plan of bulkhead seal <br />removal prior to beginning work. <br />Measurement and Payment <br />Payment for this item will be reflected in a lump sum bid under Item 4. This lump sum bid will cover <br />payment of all costs for the demolition, debris placement into the mine workings, backfilling and <br />recontouring of the air vent. There will be no measurement for payment. Payment shall be as this <br />item is completed and approved by the PROJECT MANAGER. Payment for this item will be made <br />only for that amount shown under Item 4 of the Bid Schedule. Any or all incidental costs incurred <br />by the CONTRACTOR shall be reflected in each Bid Item or shall be paid at the Contractor's <br />expense. <br />PROJECT OBSERVATION <br />The PROJECT MANAGER will be at the project site periodically to monitor construction activities <br />and ensure that each work item is completed and constructed to design specifications. The <br />PROJECT MANAGER will be available during regular business hours (8:00 A.M. to 5:00 P.M.) on <br />weekdays. Inspections will not be scheduled on weekend days or holidays without prior approval <br />of the PROJECT MANAGER. It is the Contractor's responsibility to schedule inspections with the <br />Project Manager so as not to delay the work. The following items must be observed and approved <br />by the PROJECT MANAGER before proceeding with additional work: <br />All Equipment Rental hours <br />2. Air vent structure demolition and placement <br />3. Final recontouring of air vent area prior to revegetation <br />3. All revegetation procedures. <br />The attached General Conditions for Purchase Orders and Purchase Order Terms and Conditions <br />apply to all work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.