Laserfiche WebLink
Return by May 25, 2000 at 4:00 p.m. to: <br />Yvonne Brannon <br />1313 Sherman St., #215 <br />Denver, CO 80203 <br />Fax (303)832-8106 <br />Mt. Harris Project <br />PKA-0-1081 <br />Bid Schedule <br /> UNIT <br />ITEM DESCRIPTION AMOUNT UNIT COST TOTAL <br />1. Equipment Rental -Excavator, CAT <br /> 3206E or equivalent sized w/ <br /> minimum 20' reach, turbo charged <br /> and o erator 40 Hour $ /hr. $ <br />2. Riprap -Procurement, transport and <br /> on-site lacement 30 Ton $ /ton $ <br />3. Revegetation -seeding, mulching, <br /> crim in - 1 acre 1 JOB N/A $ <br />4. Adit backfill -access improvements, <br /> structure demolition, debris <br /> lacement, recontourin 1 JOB N/A $ <br /> GRAND TOTAL. $ <br />Contractor <br />Signature <br />Address <br />Date <br />Phone <br />Fax <br />TaxID# <br />THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br />Page 1 of 1 Page <br />