Laserfiche WebLink
In the application for this permit, the buffer areas (along the north and west boundaries) were represented to be left <br />with their native timber, primarily as visual buffers, and to a lesser extent to leave a protective vegetative cover. As <br />mentioned above, since the buffer strips were not to be mined, no approved mining activity was to occur there and <br />no amount of bond was required to be posted for that area. It is clear that in order to excavate and create the <br />benches, trees must first be removed. Our understanding was that only the trees existing on the "footprint" of the <br />benches and their slopes, plus on the roadways, were going to be cut. If Bridalveil Construction (who is both the <br />permittee and landowner) decides to cut all trees on the property, including those within the buffer strips, but not <br />further disturb the surface (meaning that no excavation occus) on the buffers, this agency has no real jurisdiction. <br />But as soon as the operator began earthmoving (excavating or roadbuilding) in that buffer, our jurisdiction begins. <br />He has exceeded his approved plan by creating mining disturbance outside the azea approved for such disturbance. <br />This was noted as a problem for him to remedy. <br />The operator has been ordered to correct this problem by completely backfilling the 20-foot buffer along the north <br />boundary, and to seed the area. The bac)mlling must be done promptly to avoid failure of the cut face, which <br />would damage the property lying adjacent to that azea. It is unfortunate that the trees which were removed in the <br />portion of the buffer that was excavated cannot be replaced as promptly. <br />Since the trees had to be removed before mining could begin, log and slash removal were recognized as necessary <br />acfivities. This agency did not specify how or at what rate these activities were to be tamed out. The fact that <br />loggers removed much of the merchantable timber solves most of the disposal issue. Slash is usually burned neaz <br />where trees are cut, which is what this operator did. I observed his slash burning location, and did not have a <br />problem with that. We do not have jurisdiction over actual bum details or issue burn permits. The town might <br />have authority in that area. <br />The approved mining and reclamafion plans did not include any type of visual berm to be constructed, and we <br />cannot require such at this point in time, after the plans have been approved and permit issued. <br />The approved mining plan requires that Bridalveil Construcfion construct a runoff channel for Bridalveil Creek, <br />parallel to, but within, the south boundary of the permit area. At the base of this channel a sediment control pond is <br />to be constructed. These two structures were to precede the development of the benches, since the control of <br />sediment and runoff from this slope was considered important to stabilizing the azea. This has not been done yet, <br />and a problem has been noted with the permit. <br />The approved plan also states that after the control structures are made, the benches could be excavated, one at a <br />time. The lower and second bench are both in apartly-finished stage, meaning that Bridalveil Construction is not in <br />compliance with the approved plan on this point, and a problem has been noted. To correct these two problems, the <br />operator has been ordered to finish the control structures before further bench excavation is carried out. Once <br />bench excavation may begin, the operator has been ordered to finish the lower bench before further developing the <br />second bench. <br />As you know, lower Bridalveil Creek flows down aconvex-shaped alluvial fan of unconsolidated debris. Many <br />former channels are evident on the surface of this alluvial fan, indicating that channel changes may occur quickly <br />and frequently. The Bridalveil property does not extend up the slope to the mouth of the canyon. Though <br />stabilizing the site by constructing a channel was made a priority of this permitted plan, it is possible that changes <br />in the channel may naturally occur, possibly upslope beyond the reach or influence of Bridalvei] Construction. <br />Such changes may be destructive to personal or real property, and occur while mining is ongoing, but may not <br />necessarily be caused by or related to any mining. That is to be assessed on a case-by-case basis. <br />It should be recognized that this hillside is not an inherently stable area. The loose talus can move with a large <br />runoff event, creating new channels and depositing deep fills, often regardless of where stands of trees are. The <br />timber on the site probably provided protection against erosion from direct impact of heavy precipitation, but <br />afforded limited protecfion against mass movement due to high creek flows. <br />