My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39927
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39927
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:15 PM
Creation date
11/23/2007 10:25:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
General Documents
Doc Name
AGENDA FOR 9-20-99 MEETING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Management at San Luis <br />• Three phases of water management <br />- Phase I consists of controlling flow from the West Pit and lowering the <br />water level in the West Pit approximately 15 feet <br />• Water removed by combination of enhanced evaporation (summer 1999), <br />nanofiltration (winter of 1999), and agricultural use (pending) <br />• Pumping from the backfill and window area. <br />- Phase II consists of using the groundwater from the West Pit to <br />supplement agricultural water at the Rocky Mountain Farms. <br />- Phase III would be based on the results obtained from conducting apilot- <br />scale test of passive biological treatment to reduce sulfate, produce <br />alkalinity, and precipitate metal sulfide compounds. Additionally, <br />manganese may be treated using a passive aerobic treatment systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.