Laserfiche WebLink
Rzvisien to Section 2.05.4 <br />MINE SUMMARY <br />Facilities Removal <br />Backfill Pit <br />Reduce Pit Slopes <br />Topsoil Redistribution <br />Revegetation <br />10q Administration Cost <br />TOTAL MIP1E COSTS <br />49,023 <br />865,681 <br />23,398 <br />365,582 <br />83,700 <br />138,738 <br />1,526,122 <br /> <br />;• <br />Revised September, 1984 <br />