Laserfiche WebLink
Pevi;ion to Section 2.05.4 <br />HAYDEN GULCH LGADOUT <br />Building Removal @ .22/cu.ft. <br /> <br /> Dim Cu. Ft. Cost <br />Change House 30' x 150' x 10' 45,000 $9,900 <br />Truck Dump 40' x 40' x 10' 16,000 3,520 <br />Crusher 50' x 35' x 10' 17,500 3,850 <br />Hopper, etc. 50' x 40' x 60' 120,000 26,400 <br />Conical Storage Tf (5)2 x 30' 2,356 518 <br /> ~~,188 <br />Conveyor System = 350' @ .857/ft./!ir, x $29/h r 11 844 <br /> TOTAL 56,('32 <br />Q <br />Excavation Of Struc <br />Backhoe - Cat 215 - No haul distance <br />30" Bucket = 0.75 yd3 cap <br />Cycle time = 20 sec. <br />Prod. = 112.5 yd3 per 50 min. hour <br />Total Excavation = 8,300 yd3 <br />Time Required = 74 Equipment hours <br />74 hour ; 7.5 hrs/shift x 8 hrs/shift = 79 manhours <br />Cat 215 rents for 44.04/hr x 74/hr. = 53,259 <br />Labcr = $20/hr x 79 hours = $1,580 <br />TOTAL 4,839 <br />Revised September, 1984 <br />