My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39815
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39815
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:10 PM
Creation date
11/23/2007 10:22:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
General Documents
Doc Name
RECLAMATION COSTS
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ Revision to Section 2.05.4 ~ • <br />Reduction of Pit Slopes (ccnt'd) <br />Total D-10 hours = 90 hrs @ 238.64 = 21,478 <br />Operator hours = 96 @ 320/hr = $1,920 <br />Total Slope Reduction = 323,398 <br />Topsoil Redistribution <br />It has been determined that 336,000 yards of topsoil will have to be <br />:•edistributed in 1984. Using a scraper capacity of 27 yd3, the following <br />production rates were determined: <br /> Cycle Production <br />Stockpile Y~1s Time Min, (50 min/hr) Hours <br />A 176,000 7.4 182.4 yds/hr 965 <br />B 82,000 6.9 195.7 yds/hr 419 <br /> i <br />D 58,000 6.5 207.7 yds/hr 27 <br />E 20,000 7.2 187.5 yds/hr 107 <br /> TOTAL HOURS 1,770 <br />Using a 637D scraper <br />1770 hours @ 185.21/hr = 327,822 <br />Labor 1,888 hours x 320/hr = 37,760 <br />TOTAL TOPSOIL REDISTRIBUTIO'; 365,582 <br />Revegetatio~ Costs <br />90 acres @ 5930/acre = 83,700 <br />~~ ~ ,. <br />Revised September, 1984 <br />
The URL can be used to link to this page
Your browser does not support the video tag.