Laserfiche WebLink
PEAK FLOW SHALL BE MEASURED IN MAGPIE CREEK ON A QUARTERLY BASIS AT THE CURRENT <br />MONITORING STATION. DATA ACQUIRED FROM THIS MONITORING SHALL BE SUBMITTED QUARTERLY <br />AND INCLUDED IN THE ANNUAL HYDROLOGY REPORTS FOR THE MINE. <br />Status: Continued, annual submittals required. <br />Stipulation No. 15 <br />THE OPERATOR SHALL MONITOR FLOWS IN SECOND ALKALI CREEK SO AS TO MEASURE MINIMUM AND <br />MAXIMUM FLOWS DURING EACH QUARTER FOLLOWING APPROVAL OF PERMIT REVISION NO. 1. DURING <br />THE AONITORING YEAR, AT LEAST ONE GRAB SAMPLE SHALL BE COLLECTED WHEN STREAMFLOW IS <br />PRESENT. THIS SAMPLE SHALL BE SUBMITTED FOR LAB ANALYSIS FOR TOTAL DISSOLVED SOLIDS, <br />TOTAL SUSPENDED SOLIDS, PH, TOTAL DISSOLVED IRON, AND MANGANESE. RESULTS OF THESE <br />ANALYSES SHALL BE SUBMITTED TO THE DIVISION WITHIN 5O DAYS FOLLOWING THE END OF THE FIRST <br />MONITORING YEAR WHICH ENDS ON TUNE 30, 1992. <br />Status: Continued, annual submittals required. <br />Stipulation No. 18 <br />THE APPLICANT WILL SUBMIT TO THE DIVISION AN ANNUAL REPORT OF THE INFLOWS, DISCHARGES AND <br />CONSUMPTION OF WATER WITHIN THE MINE. THIS REPORT IS TO INCLUDE A MINE WORKINGS MAP <br />SHOWING THE LOCATION AND QUANTITY OF INFLOW; A TABLE KEYED TO THE MINE MAP WHICH SHALL <br />CONTAIN THE SOURCE (I.E. FAULT, FRACTURES, ETC.), QUANTITY, DURATION AND QUALITY (I.E., PH, <br />ELECTRO-CONDUCTIVITY AND TEMPERATURE) OF ALL INFLOWS; A TABLE CONTAINING RECORDS OF <br />WATER DISCHARGED FROM THE MINE, CONSUMED IN THE MINE AND IMPORTED FOR USE WITHIN THE <br />MINE; AND A DISCUSSION OF WATER BALANCE WITHIN THE MINE. THE INFLOW STUDY IS TO BE DONE <br />DURING THE SPRING OF EACH YEAR WITH THE REPORT SUBMITTED BY AUGUST I. <br />Status: Continued -annual submittals required. <br />Stipulation No. 24 <br />AS A COMPONENT OF THE 1994 PERMIT RENEWAL AND BOND ESTIMATE REVIEW, THE DIVISION HAS <br />DETERMINED THAT THE CURRENT EFCI RECLAMATION PLAN IS DEFICIENT IN THE FOLLOWING AREAS: <br />THE MASS BALANCE FOR THE OVERBURDEN AND TOPSOIL FOR THE FINAL REFUSE PILE <br />CONFIGURATION NEEDS TO BE CALCULATED AND IF ANY DEFICIT IS FOUND, EFCI NEEDS TO <br />SUBMIT A PLAN TO MAKE UP THE DIFFERENCE IN OVERBURDEN AND TOPSOIL. <br />2. FINAL DEPOSITION OF THE ON-SITE CONCRETE NEEDS TO BE CLARIFIED IN THE PERMIT. <br />3. SHOULD EFCI WISH TO PURSUE AN ALTERATION FROM THE PRESENTLY APPROVED POST-MINING <br />CONTOURS AND CONFIGURATION AT THF. LOADOUT, THIS ISSUE NEEDS TO BE ADDRESSED IN A <br />TECHNICAL REVISION TO BE REVIEWED AND APPROVED BY THE DIVISION. <br />Southfield Mine (C-81-030) April 18, 1997 <br />Midterm Revitw 5 Thifd Permit Tenn <br />