My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39740
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39740
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:06 PM
Creation date
11/23/2007 10:20:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
General Documents
Doc Date
4/18/1997
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. IN ORDER TO VERIFY FACILITY BACKFILL VOLUMES, THE OPERATOR WILL PROVIDE AN <br />ACCURATE CURRENT TOPOGRAPHIC/CONTOUR MAP WITH APPLICABLE CROSS-SECTIONS TO REVISE <br />MAPS 6 AND 7. <br />THE ABOVE ISSUES ARE TO BE RESOLVED IN A REVISION(S) TO BE SUBb11TTED WITHIN 6O DAYS <br />OF PERMIT RENEWAL. <br />Status: Continued, parts 1, 2, and 4 have been complied with. Part 3 remains outstanding. <br />The following stipulations have been imposed since the permit was renewed. <br />Stipulation No. 25 <br />THE OPERATOR WILL SUBMIT A REVISED MAP 1 WHICH DEPICTS THE LOADOUT PERMIT BOUNDARY. <br />THIS MAP WILL BE SUBMITTED AS PART OF THE ONGOING TECHNICAL REVISION NO. 2O. <br />Status: The required map was submitted on August /8, 1995, and the stipulation was terminated. <br />Stipulation No. 26 <br />THE PERMIT BOUNDARY SHALL BE REVISED IN ACCORDANCE WITH TECHNICAL REVISION NO. 23 ON <br />MAPS 6, 17, 19, 20, AND 2S. THREE COPIES OF THE REVISED MAPS SHALL BE SUBMITTED VIA THE <br />MINOR REVISION PROCESS NO LATER THAN JULY 10, 1996. <br />Status: The required maps were submitted on August /9, 1996, and the stipulation was terminated. <br />Section V -Decision to Require Revisions <br />As a result of this midterm review, the Division will require revision(sj of the permit to address the <br />following concerns with the currently approved Southfield Mine permit application. <br />Please verify or update the ownership and control information in the currently approved permit <br />application package. <br />2. Please update pages 2.05.3-17, 2.05.4-11, and 2.05.4-16 to reflect the current reclaimed status <br />of the loadout. <br />3. The loadout area has been reclaimed and apost-mine sediment control plan has been revised. <br />The reclaimed topography and drainage configuration differs from the currently approved plan. <br />No revision has been submitted or approved for the variance. As noted in the summary of <br />stipulations above, a revision for the change in topography was to be submitted within 60 days <br />of the 1994 permit renewal. Please submit a description and maps showing the current <br />topography, drainage patterns, and sediment control at the loadout. <br />4. Please update the reclamation cost estimate discussions in page 2.05.4-6R, Sec[ion 3.0, and <br />Southricld Minc (C-SIA30) April 18, 1997 <br />Midterm Review 6 Third Permit Term <br />
The URL can be used to link to this page
Your browser does not support the video tag.