Laserfiche WebLink
-4- <br />List of Stipulations <br />Stipulation No. 1 <br />PRIOR TO PERMIT ISSUANCE THE APPLICANT SHALL UPDATE, INCORPORATE, AND REWRITE <br />THE PERMIT APPLICATION TO REFLECT ALL CHANGES AND MODIFICATIONS MADE DURING <br />THE REVIEW PERIOD. THE DIVISION SHALL BE PROVIDED WITH FOUR COPIES OF THE <br />REVISED DOCUMENT. THE FEDERAL OFFICE OF SURFACE MINING SHALL BE PROVIDED <br />SEVEN COPIES. <br />Stipulation No. 2 <br />THE DIVISION DIRECTS CHIMNEY ROCK COAL TO VERIFY THE ACCURACY OF ITS <br />OVERBURDEN/INTERBURDEN SWELL FACTOR AND BULKING PROJECTIONS FOR THE PERMIT <br />REVISION N0. 2 AREA. IN ORDER TO ACCOMPLISH THIS VERIFICATION, CHIMNEY ROCK <br />COAL, SHALL COMPLETE AN ANNUAL SURVEY OF THE DISTURBED AREA. THE COMPANY <br />SHALL UTILIZE STANDARD AERIAL OR FIELD SURUEY TECHNIQUES IN COMPLETING THE <br />REQUIRED SURVEY. THE SURVEY MAP AND A REPORT ANALYZING CONFORMANCE WITH THE <br />AMENDED POST-MINING TOPOGRAPHY SHALL BE SUBMITTED ANNUALLY TO THE DIVISION. <br />Stipulation No. 3 <br />THE DIVISION DIRECTS CHIMNEY ROCK COAL COMPANY, AS RECOt4MENDED IN ITS <br />CONSULTANT'S GEOTECHNICAL STABILITY ANALYSIS OF THE DEEP CREEK EXCESS SPOIL <br />PILE, TO CONDUCT BY-WEEKLY INSPECTIONS OF THE SUBDRAINS TO BE CONSTRUCTED <br />BENEATH THE EXCESS SPOIL PILE. THE OPERATOR SHALL HAVE THESE BY-WEEKLY <br />INSPECTIONS COMPLETED BY AN APPROPRIATELY QUALIFIED AND LICENSED PROFESSIONAL <br />ENGINEER. CERTIFIED REPORTS, INCLUDING PHOTOGRAPHY, SHALL BE MAINTAINED AT <br />THE MINE SITE. REPORTS SHALL BE SUBMITTED TO THE DIVISION QUARTERLY. THE <br />DIVISION SHALL BE INFORMED IMMEDIATELY OF ANY SUBSTANDARD INSPECTION <br />FINDINGS. FURTHER, CHIMNEY ROCK COAL COMPANY SHALL MONITOR THE GROUND WATER <br />ELEVATIONS BENEATH THE PILE, ON A MONTHLY BASIS, AND SUBMIT THE RESULTS OF <br />THAT MONITORING TO THE DIVISION QUARTERLY. <br />