Laserfiche WebLink
., <br />• <br />IV. The Proposed Action <br />This mining plan action consists of a mining plan <br />modification for Federal lease COC-54608. Specifically, the <br />mining plan modification proposed by TCC consists of: <br />Coal removal from the Wadge seam in: <br />(1) Eastern Mining District. [Sections 21, 23, 26, 27 <br />and 28; Township 5 North, Range 86 West of the 6th P. <br />M.] . <br />Longwall panels 2 Right through 6 Right <br />Gateroads 2 Right through 4 Right <br />Extension of the Southeast Mains <br />(2) Northern Mining District. [Sections 21 and 22; <br />Township 5 North, Range 86 West of the 6th P. M.] <br />Northeast Mains only <br />The life of the mining operations is expected to continue <br />for 5 years under Colorado Permit No. C-82-056 and this <br />proposed mining plan modification. <br />C <br />The average annual production rate and the maximum <br />production rate would not change. <br />The approved State permit area would not increase from its <br />present 22,240 acres. However, the approved affected area <br />would increase by 1,146 acres to a new total of 10,791 <br />acres. Surface disturbance within the approved State permit <br />area will not increase beyond the approved 344 acres. <br />Approval of this mining plan modification will increase the <br />number of acres of Federal coal in the approved mining plan <br />area by 866 acres to a new total of 5,427 acres as shown on <br />the map included with this decision document. <br />Approval of this mining plan modification will authorize <br />mining of an additional 10.3 million tons of Federal coal <br />for a new total of 40.0 million tons. <br />No Federal surface lands will be included in the mining plan <br />area as a result of this action. <br />The postmining land use within the permit and mining plan <br />area will not change. <br />• -3 <br />