Laserfiche WebLink
-6- <br />Stipulation No. 16: <br />WITHIN 90 DAYS OF PER^fIT ISSUANCE, THE PER~NITTEE WILL SUB!fIT A <br />HAUL ROAD RECLAMATION PLAN TO THE DIVISION WHICH WILL ADDRESS <br />RECLAMATION OF THE PIT 1J0. I HAUL ROAD. THIS PLAN WILL, AT A <br />MINIMUM, ADDRESS APPLICABLE DESIGN CRITERIA OF 9.03 FOR THE ROAD <br />TO BE LEFT, PLANS FOR TOPSOILING AND SEEDING, AND A DE140NSTRATION <br />THAT THE MATERIAL LEFT IN THE ROAD BASE WILL NOT CAUSE A MATERIAL <br />SHORTAGE ELSEWHERE IN THE PERMIT AREA. THIS PLAN AND RECLAMATION <br />ACTIVITIES SHALL BE Ib1PLEMENTED IMMEDIATELY UPON APPROVAL BY THE <br />DIVISION. <br />Stipulation No. 17: <br />WITHIN 90 DAYS AFTER PEP,MIT ISSUANCE, TRINIDAD BASIN MINING SHALL <br />SUBMIT TO THE DIVISION A CERTIFICATION DOCUMENT WHICH STATES THAT <br />ALL HAUL ROADS WERE CONSTRUCTED OR RECONSTRUCTED IN ACCORDANCE WITH <br />THE PLAN CONTAINED IN THE APPROVED MLRD PERMIT APPLICATION. THE DOCU- <br />MENT SHALL BE CERTIFIED BY A QUALIFIED REGISTERED PROFESSIONAL <br />ENGINEER. THIS CERTIFICATION DOCUMENT ZS ALSO REQUIRED TO BE <br />SUBMITTED AFTER CONSTRUCTION OF ANY' NEW HAUL ROADS RT THE MINE. <br />Stipulation No. 18: <br />THE PERMITTEE IS REQUIRED TO IMMEDIATELY INCORPORATE RLL PREVIOUSLY <br />APPROVED SUBMITTALS REGARDING THE TRINIDAD LOADOUT FACILITY INTO <br />THIS PERMIT DOCUMENT, AND IS BOUND TO FOLLOW THE OPERATION AND <br />RECLAMATION PLAN PREVIOUSLY APPRGVED BY THE DIVISION. <br />