Laserfiche WebLink
-5- <br />Sti pvlation No. 11: <br />THE PERMITTEE SHALT SUBMIT TO THc DIVISION A BIEhINIAL REVEGETATION <br />MONITORING PLAN FOR DIVISION REVIEFJ AND APPROVAL, WITHIN 120 DAYS <br />OF PERI'4IT ISSUANCE. UPON DIVISION APPROVAL, THE PLAN SHALL BE <br />INITIATED. <br />Stipulation No. I2: <br />IF, DARING THE VEGETATION SAh1PLING, IT ZS DETERMINED THAT THREATENED <br />OR ENDANGERED PLANT SPECIES INNABIT THE PERhfIT AREA, THE PERMITTEE <br />SHALL IMhfEDIATELY NOTIFY THE DIVISION. THE DIVISION WILL TX EN DETERMINE <br />WHAT MEASURES WILL BE REQUIRED TO INSURE THE CONTINUED EXISTENCE OF <br />THESE SPECIES. <br />Stipulation No. 13: <br />THE PERMITTEE SHALL PROVIDE THE DIVISION WITH DESIGNS FOR ADDITIONAL FUTURE <br />ELECTRIC POWER LINES AND OTHER TRA,VSI7ISSION FACILITIES TD BE CONSTRUCTED <br />ON THE PERMIT AREA, WITHIN 30 DAYS OF PERMIT ISSUANCE. THE PERMITTEE <br />WILL CONSTRUCT RLL FUTURE FACILITIES IN ACCORDANCE WITH REA DESIGNS <br />F4HICH PREVENT RAPTOR ELECTROCUTION. <br />Stipulation No. I4: <br />THE DIVISION DIRECTS TRINIDAD BASIN MINING TO SUBhiZT THE DATA AND <br />ANALYSIS OF OVERBURDEN SG7ELL AND MATERIAL BALANCES RELIED UPON BY <br />THE COMPANY TO PROJECT OVERBURDEN SF/ELL FACTORS FOR THE TRINIDAD <br />BASIN MINE. THIS INFORMATION RND A REPORT OF THE ANALYSIS SHALL <br />BE SUBfITTED TO THE DIVISION FOR REVIEW WITHIN 30 DAYS FOLLOWING <br />APPROVAL OF THE PERMIT. THIS INFORMATION SHALL INCLUDE DISCUSSION <br />OF PREVIOUS PIT VOLUhfES, PRE- AND POST-b12NZNG TOPOGRAPHY OF <br />PREVIOUSLY MINED AREAS, INCLUDING PROPOSED AND EXISTING ROAD <br />CONFIGURATIONS, APID OVERBURDEN STRRTIGRAPHY AND 541ELL CHARACTERISTICS, <br />AT A MINIMUh1. h1INING SHALL NOT PROCEED BEYOND CUT NO, I3 OF PIT <br />NO. 4 PRIOR TO CPRITTEN APPROVAL BY THE DIVISION OF THIS ANALYSIS. <br />Stipulation No. I5: <br />THE DIVISION DIRECTS TRINIDAD BASICI MINING C019PANY TO AMEND ITS <br />POST-MINING TOPOGRAPHIC MAPS AND APPROPRIATE PERMIT APPLICATION <br />NARRATIVES TO SPECIFICALLY DISCUSS ITS PLAN TO ACCOMMODATE THE <br />PROJECTED BACKFILL hfATERIAL BALANCE RESULTS PORTRAYED IN CORRECTED <br />TABLE V-I OF THE .~,~fENDED PERMIT RPPLICP.TION. <br />THESE APPLICATION AMENDMENTS SHALL BE SUBMITTED TO THE DIVISION <br />FOR REVIEW NO LATER THAN 60 DAYS FOLLOWING APPROVAL OF THE <br />PERMIT. MINING SHALL NOT PRGrEED BEYOND CUT NO. I3 OF PIT <br />NO. 4 PRIOR TO WRITTEN APPROVAL BY THE DIVISION OF THESE <br />AMENDMENTS. <br />