My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL37970
DRMS
>
Back File Migration
>
General Documents
>
GENERAL37970
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:54 PM
Creation date
11/23/2007 9:25:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
General Documents
Doc Date
12/9/1982
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Backfilling and Grading (con!t) <br />-56- <br />The post-mining topography map, Exhibit F, is adequate with one exception. <br />In the area of pond 1,Exhibit F indicates additional surface disturbance <br />from grading operations that could result in a loss of established riparian <br />vegetation. The area affected by the additional disturbance appears to be <br />less than 1 acre. The area is relatively small. The Division feels that <br />protection of riparian habitat is important and that manipulation of the <br />final contours on Exhibit F would limit the total area of disturbance and <br />protect the existing riparian vegetation. Therefore, the following <br />stipulation is imposed: <br />2. BLUE RIBBON COAL COMPANY SHALL REVISE EXHIBIT F OR OTHERWISE AMEND THE <br />PERMIT APPLICATION ~ ENSURE PROTECTION OF ESTABLISHED RIPARIAN VEGETATION <br />ADJACENT TO POND 1. A REVISED EXHIBIT F OR OTHER AMENDMENT DEMONSTRATING <br />PROTECTION OF THE RIPARIAN HABITAT MUST BE SUBMITTED TO THE DIVISION WITHIN <br />30 DAYS OF PERMIT ISSUANCE. <br />Blue Ribbon Coal Company has committed to performing appropriate geotechnical <br />analysis to demonstrate conformance with the stability requirement of the <br />4.14.2(1)(b) (see Appendix D). No date by which the work specified in <br />Appendix D of the application would be submitted to the Division is specified <br />and it is not clearly stated in the application that the proposed reclaimed <br />configuration of the haul road would be included in the analysis. In order <br />to assure timely completion of the required report and inclusion of the <br />proposed reclaimed configuration of the haul road in the analysis, the Division <br />imposes the following stipulation: <br />3. BLUE RIBBON COAL COMPANY SHALL PROVIDE AN ACCEPTABLE STABILITY ANALYSIS <br />OF THE PROPOSED BACKFILLED CONFIGURATION OF ALL MINE FACILITIES AND THE <br />HAUL ROAD, INCLUDING AN APPROPRIATE MATERIAL SHEAR STRENGTH TESTING <br />REPORT. THIS STABILITY ANALYSIS SHALL DEMONSTRATE COMPLIANCE WITH THE <br />STATIC S7APE SAFETY FACTOR REQUIR EAfENTS OF RULE 4.27.4(1). THIS ACCEPTABLE <br />STABILITY ANALYSIS SHALL BE SUBMITTED 10 THE DIVISION WITHIN 60 DAYS OF <br />PERMIT ISSUANCE. <br />Underground development waste generated at the Blue Ribbon Mine will be <br />hauled to the Red Canyon mine's permitted waste disposal pile site. Both <br />mines are currently managed by Western Associated Coal Corporation. <br />With the addition of the above stipulations the application is in compliance <br />with the requirements of this secfi;on. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.