Laserfiche WebLink
Stipulation No. 45 <br />MCC MUST RESOLVE OUTSTANDING ISSUES FROM 1991 PERMIT RENEWAL (SEE SPECIFIC <br />INFORMATION IN THE DIVISION'S LETTER DATED DECEMBER 2, 1992). THE INFORMATION <br />SHALL BE SUBMITTED BY DECEMBER 30, 1992. <br />STATUS: COMPLIED WITH 2/2/1993. <br />Stipulation No. 46 <br />MCC MUST SUBMIT AN UPDATED SPCC PLAN TO INCLUDE M THE PERMIT UPON APPROVAL <br />FROM THE COLORADO DEPARTMENT OF HEALTH. <br />STATUS: COMPLIED WITH 4/26/1993. <br />Stipulation No. 47 <br />MCC MUST SUBMIT REVISED MAPS AND PAGES FOR MINOR REVISION 87. <br />STATUS: COMPLIED WITH 6/21/1993. <br />Stipulation No. 48 <br />MCC MUST SUBMIT REVISED SECTION 2.05 IN THE PERMIT DOCUMENT UPON APPROVAL OF <br />TECHNICAL REVISION 64. <br />STATUS: COMPLIED WITH 9/7/1993. <br />Stipulation No. 49 <br />MCC MUST ADDRESSTHE DIVISION'S ASSERTION THAT A TOPSOIL DEFICIT EXISTS FOR FINAL <br />RECLAMATION. IF THERE IS A DEFICIT, MCC MUST PROVIDE A DETAILED PLAN WHICH <br />SPECIFIES HOW THE DEFICIT WILL BE ACCOMMODATED. IF SUBSOIL IS DESIGNATED AS A <br />SUITABLE GROWTH MEDIUM, THEN THE PERMIT SHOULD BE REVISED TO SPECIFY HOW MUCH <br />SUBSOIL WILL BE UTILIZED, WHERE IT WILL BE STORED, AND HOW IT WILL BE PROTECTED. A <br />REVISION ADDRESSING THE ABOVE SHOULD BE SUBMITTED TO THE DIVISION ON OR BEFORE <br />OCTOBER 29, 1993. <br />STATUS: COMPLIED WITH 11/19/1993. <br />Stipulation. No. 50 <br />DITCH DESIGNS ASSOCIATED WITH THE RELOCATED TOPSOIL PILE SHOULD BE PROVIDED BY <br />OCTOBER 18, 1993, TO BE INCORPORATED INTO EXHIBIT 66. THE DESIGNS SHOULD REFLECT <br />STORM EVENTS APPROVED IN TECHNICAL REVISION 64 AND SHOULD BE COMPLETED IN <br />ASSOCIATION WITH TECHNICAL REVISION 6S. UNTIL THAT TIME, DITCHES SHOULD BE <br />CONSTRUCTED TO HAVE MINIMUM DESIGNS AS REQUIRED BY DITCHES D1-4 AND 2-2D. <br />14 <br />