My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-13_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2007-02-13_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 6:50:10 AM
Creation date
11/23/2007 9:08:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
2/13/2007
Doc Name
Proposed Decision & Findings of Compliance for RN5
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 40 <br />PRIOR TO DISTURBING THE AREA OF THE STORAGE PAD, MCC MUST SUBMIT CALCULATIONS <br />TO SHOW THAT THE SEDIMENT POND RECEIVING THE RUNOFF FROM THE STORAGE PAD IS <br />SUFFICIENTLY SIZED TO HANDLE THE CALCULATED VOLUME OF WATER. <br />STATUS: COMPLIED WITH 11/2$/1991. <br />Stipulation No. 41 <br />PRIOR TO THE IMPORTATION OF FILL MATERIAL TO CONSTRUCT THE COAL STACKING TUBE <br />PAD, MCC MUST SUBMIT BOND CALCULATIONS AND UPDATE THE RECLAMATION PLAN FOR <br />THE REMOVAL OF THE FILL MATERIAL. THE SOURCE OF THE FILL MATERIAL MUST BE <br />IDENTIFIED. IF GOB IS TO BE USED, THIS MUST BE PROPOSED AS A TECHNICAL REVISION AND <br />BS SUPPORTED WITH DESIGNS THAT MEET THE DIVISION'S PERFORMANCE STANDARDS FOR <br />COAL WASTE BANKS. PLANS MUST BE CERTIFIED BY A QUALIFIED ENGINEER. <br />STATUS: COMPLIED WITH 11/2$/1991. <br />Stipulation No. 42 <br />THE INFORMATION SUBMITTED WITH THE TECHNICAL REVISION AND AS PART OF THE <br />STIPULATION RESPONSES MUST BE INCORPORATED INTO THE NEW REORGANIZED PERMIT <br />APPLICATION. STIPULATION RESPONSES MUST BE SUBMITTED AS MINOR REVISIONS OR, !F <br />GOB IS TO BE USED AS FILL, THAT PORTION MUST BE SUBMITTED AS A TECHNICAL REVISION. <br />STATUS: COMPLIED WITH 2/2/1993. <br />Stipulation No. 43 <br />MCC MUST SUBMIT AS-BUILT DESIGNS FOR ALL STRUCTURES AT THE WEST ELK MINE SITE, <br />INCLUDING BUT NOT LIMITED TO: ALL SURFACE FACILITIES, DEWATERING SYSTEM, PORTAL <br />BENCH AND PORTAL STRUCTURES, WATER TREATMENT PLANT, STORAGE TANKS, AND WASTE <br />WATER PLANT BY DECEMBER 3Q 1992. <br />STATUS: COMPLIED WITH 5/14/1993. <br />Stipulation No. 44 <br />MCC MUST REVISE WINDY GAP POLICY CALCULATIONS FOR ANNUAL NET WATER <br />DEPLETION, COORDINATE WITH THE U.S. FISH AND WILDLIFE SERVICE AND PROVIDE ALL <br />INFORMATION TO THE DIVISION TO INCORPORATE INTO THE PERMIT. AN APPLICATION FOR A <br />TECHNICAL REVISION TO INCLUDE THE REVISED INFORMATION SHOULD BE RECEIVED BY <br />DECEMBER 31, 1992. <br />STATUS: COMPLIED WITH2/I/1993. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.