Laserfiche WebLink
STATUS: COMPLIED WITH 10/1/1993. <br />Stipulation No. 51 <br />THE DIVISION 4 WATER COURT SHALL BE NOTIFIED OF THE NEW POND LOCATIONS WITHIN 45 <br />DAYS OF DMG'S PROPOSED DECISION. IN ADDITION, A DAM SAFETY REVIEW SHALL BE <br />COMPLETED ON MB-2 AND M$-3 WITHIN 45 DAYS AFTER CONSTRUCTION OF THE PONDS IS <br />COMPLETED. (COMMENTS RECEIVED FROM THE DIVISION OF WATER RESOURCES DATED <br />SEPTEMBER 17, 1993.) <br />STATUS: COMPLIED WITH 4/3/1995. <br />Stipulation No. 52 <br />SUBMIT TYPICAL CROSS-SECTIONS, DETAILS OF DISTURBANCE THAT WILL OCCUR, AND <br />RECLAMATION WORK TO BE COMPLETED FOR THE EXPLORATION ROAD THAT WILL BE <br />CONSTRUCTED IN LONE PINE GULCH. <br />STATUS: COMPLIED WITH 4/12/1994. <br />Stipulation No. 53 <br />ALL UNRESOLVED PERFORMANCE STANDARD ISSUES AND SUBMITTAL REQUIREMENTS SUCH <br />AS, BUT NOT LIMITED TO, GEOTECHNICAL STABILITY ISSUES, SEDIMENT CONTROL PLANS, <br />BONDING REQUIREMENTS, AND REVISED PAGE, MAP AND/OR EXHIBIT HARD COPY <br />SUBMITTALS, SHALL BE SUBMITTED AND APPROVED BY THE APPROPRIATE REVISION <br />PROCESS PRIOR TO PROJECT INITIATION. <br />STATUS: COMPLIED WITH 8/22/1994. <br />Stipulation No. 54 <br />FOR THE REFUSE PILE EXPANSION, MCC OR ITS CONSULTANTS SHOULD EITHER (1) PREPARE <br />A MORE DESCRIPTIVE JUSTIFICATION FOR THE SELECTION OF THE MECHANICAL PROPERTIES <br />USED IN COMPLETING THE ANALYSIS OR (2J PERFORM A SENSITIVITY ANALYSIS OF THE P[LE <br />USING THE SELECTION OF COAL REFUSE STRENGTH VALUES CONTAINED fN THE EARLIER <br />LOWER REFUSE PILE STABILITY ANALYSIS. THIS INFORMATION SHOULD BE SUBMITTED ON <br />OR BEFORE FEBRUARY 17, 1995. THE DISPOSAL OF THE COAL WASTE SHOULD NOT BEGIN <br />UNTIL THE INFORMATION REQUIRED HAS BEEN REVIEWED BY THE DIVISION. <br />STATUS: COMPLIED WITH 2/16/1995. <br />Stipulation No. 55 <br />MCC MUST SUBMIT ADDITIONAL INFORMATION REGARDING A REPAIR PLAN FOR THE HAUL <br />ROAD. A PLAN VIEW OF THE SURFACE WATER DRAINAGE, CROSS SECTION OF BUTTRESS <br />15 <br />