Laserfiche WebLink
<br />--- ear =z; -ion .lo. o - :zainen~ u;n_ of ~: :ion aaa c~arfr ca~i;;n. Tni; <br />:_-: _ ='/1 ::Cn UC~i~.?'.~. =31:JlaCiJnS 3i1 ~_ r11c.i i.?f" -ii CU I'/e.-[;. :itUl?;~ <br />S,?c anc area; or demcn;traticn. <br />Rev;;ion approved (March 8, 1991). <br />T?clinical Revision N0. i - Ditch H-3 modification. This revision requested <br />permanent status for all of ditch H-3 to aid in supplying water to the <br />permanent impoundment M3S. The revision was approved to allow retention of <br />only a portion of ditch H-3. <br />Revision approved (January 27, 1992). <br />Minor Revision No. 1 - Minor revision to allow for storage of non-coal wastes <br />adjacent to the Middle Creek office area. <br />Revision approved (June 14, 1985). <br />Minor Revision No. 2 - Minor revision to delay topsoiling of the Middle Creek <br />Pit area due to potential spoil settling. <br />Revision approved (September 19, 1985). <br />Miner Revision No. 3 - Minor revision to submit the CYCC Mine No. 3 Annual <br />Hydrologic Report on ~~larcn 31, 1987 and dele*_e the requirement of an annual <br />reclamation report. <br />Revision approved (February 27, 1986). <br />Miner Revision No. 3 - CYCC committed to rip the surface material prior to <br />topsoiling the mine office area. <br />Revision approved (June 8, 1987). <br />,Miner Revision No. 5 - Gullies greater than nine inches will be repaired by <br />October 31. <br />Revision approved <br />Miner Revision No <br />Revision approved <br />Miner Revision No <br />Revision approved <br />Minor Revision No <br />Revision approved <br />14inor Revision No <br />Revision approved <br />(June 8, 1987). <br />6 - Deletion of total recoverable cation test <br />(November 15, 1988). <br />7 - Grazing plan. <br />(August 11, 1989). <br />3 - Clarification of spoil spring monitoring. <br />(October 6, 1989). <br />9 - SAE for office topsoil pile. <br />(March 15, 1990). <br />-3- <br />