Laserfiche WebLink
~, <br /> <br />_. _ <br />l.~__ .~~. mCi~- r?~Icma`iGn G~~<. :~1 _.+O __ ~ <br />and hl3-S~. CYCC oaC<filled trap mine pi r and instailzd oe:~acering devices co <br />preparz the pG n(75 for Che OUaI pUrp0i2 of ;?•7 iiTi2 :"it ~CnC 01 3n7 i-J~< <br />~.aatering. ,?pproval cf the ponds as permanent impG!inpmznr--; :gas given in <br />February 1937 (TR-03>. <br />No reclamation is to take place at the Middle Creek office area until 2005. <br />Reclamation of the Middle Creek office area provides for removal of the <br />structure and restoration of the essential hydrologic functions of the <br />alluvial valley floor that the office complex currently occupies. <br />II. Revisions to the CYCC Mine No. 3 Permit <br />The following revisions to the CYCC Mine No. 3 permit have been submitted to <br />the Division since the issuance of the CYCC Mine No. 3 permit. Each of these <br />revisions have been re-evaluated as part of the midterm review process. A <br />brief description of each revision and the action taken by the Division on <br />each revision is presented in the following paragraphs. <br />Technical Revision No. 1 - Revised Sediment Control Plan provided for primary <br />dewatering devices for ponds M3-S and M3-N, sediment control for the area <br />above the Homestead Ditch and additional drainage controls. <br />Revision approved (November 24, 1986). <br />Technical Revision No. 2 - Request for a reduction in hydrologic monitoring. <br />The technical revision eliminated four bedrock and three alluvial ground water <br />monitoring wells from the monitoring plan. Stream monitoring sites 18, 60 and <br />99 were also deleted from the program. Bedrock monitoring well sampling <br />frequency was reduced from quarterly to semi-annual. Several water quality <br />parameters were deleted from the full-suite analysis list. An annual spring <br />and seep survey and a commitment to monitor spoils springs on the property <br />were added to the monitoring plan. <br />Revision approved (February 1, 1987). <br />Technical Revision No. 3 - Revision to retain ponds M3-S and M3-N as permanent <br />structures. <br />Revision approved (February 12, 1987) <br />Technical Revision No. 4 - Modification of Rill and Gully Plan. Mine No. 3 <br />had some problems with erosion and, as a result of the previous midterm <br />review, a revision was requested to modify the Rill and Gu11y Plan. <br />Revision approved (May 8, 1989). <br />Technical Revision No. 5 - Incidental boundary change. A parcel of <br />undisturbed land described as SW 1/4 SE 1/4 SE 1/4 of Section 1 of Township 5 <br />North, Range 86 West, was removed from the permit area. <br />Revision approved (May 31, 1989) <br />