Laserfiche WebLink
Damage Repairs Anticipated <br />Categorylltem Required Completion Comments <br />Cation Pond <br />Outfalls (coot) <br />E Pyeatt #2 Repair headcut and down- <br />cutting. Place rock and/or brush. <br />E Pyeatt #3 Repair headcut and down- <br />cutting. Place rock and/or brush. <br />W Pyeatt #1 Repair erosion in outfall with <br />rock and/or brush. <br />No Name #2 Repair headcut on emergency <br />spillway outfall. Place rock and/ <br />or blush. <br />fall '97 weather <br />permitting <br />fall'97 weather <br />permitting <br />field season <br />'98 <br />field season <br />'98 <br />Flumes <br />NPDES #17 (Oak) Remove brush and sediment. <br />#11 (E Pyeatt) Remove brush and sediment. <br />#13 (W Pyeatt) Relocate flume downstream at <br />bottom of spillway. <br />complete Oct'97 <br />complete Oct'97 <br />complete Oct'97 <br />Culvert A-3 Eroded at outfall, need rock <br />rip-rap added. <br />Culvert A-5 (2) Clean out inlet of culvert plugged <br />wRh sediment and brush. <br />Culvert SA-3 Eroded at outfall, place rock <br />and/or brush. <br />Culvert GRS-1 Minor scouring at outlet end. <br />Headcut in channel downstream <br />requiring rock and/or brush. <br />Culvert A-12 Minor erosion at both inlet and <br />outlet ends. <br />complete <br />Oct '97 <br />Spilhvay functional pending <br />repairs. <br />Spilhvay functional pending <br />repairs. <br />Spillway functional pending <br />repairs. <br />Spillway functional pending <br />repairs. <br />complete Cleaned out with trackhoe. <br />Sep '97 <br />complete <br />Oct '97 <br />fall '97 Culvert functional pending <br />weather repairs. <br />permitting <br />complete <br />Oct '97 <br />Page 2 of 4 <br />