Laserfiche WebLink
TRAPPER MINE DAMAGE ESTIMATE, REPAIR PLAN 8 SCHEDULE <br />100-YEAR STORM EVENT OF SEPTEMBER 18-19, 1997 <br />October 21, 1997 <br />Damage Repairs Anticipated <br />tegory/Item Required Completion Comments <br />Impacts <br />Stoddard's road Build new road on hillside away Complete Long-term solution, as agreed <br />(Oak Drainage) from drainage bottom. Oct'97 between Stoddani's and mine. <br />Stoddard's haystack Bottom rows of hay damaged Awaiting dam- Trapper will pay for damaged <br />(Oak Drainage) by Flood. age estimate. hay. <br />Martin's cut hay Hay cut but not yet bailed was Awaiting dam- Trapper will pay for damaged <br />(Oak Drainage) Flooded and damaged. age estimate. hay. <br />rtion Pond Dragline brought in from <br />Deposition Denver to remove sediment. <br />Oak #1 Exceeded 60°k deposition. <br />E Pyeatt #1 Exceeded 60% deposition. <br />E Pyeatt #2 Exceeded 60°~ deposition. <br />complete Od'97 <br />complete Od'97 <br />fall'97 weather <br />permitting <br />No Name #2 Exceeded 60°~ deposition. <br />fall '97 weather <br />permitting <br />lation Pond <br />Outfalls <br />Oak #1 Repair erosion. Replace dam- <br />aged erosion control fabric. <br />fall'97 weather <br />permitting <br />Oak #2 Repair erosion. Replace dam- <br />aged erosion control fabric. <br />Grouse #1 Repair erosion. Replace dam- <br />aged erosion control fabric. <br />E Pyeatt #1 Repair headcut and down- <br />cutting. Place rock and/or brush. <br />fall '97 weather <br />permitting <br />fall '97 weather Outfall is stable as erosion <br />permitting is to bedrock control. <br />fall '97 weather Spillway functional pending <br />Page 1 of 4 <br />