Laserfiche WebLink
<br />Damage <br />Repairs Anticipated <br />Required Completion <br />Comments <br />Channels <br />Repairs to reconstructed <br />channels will involve primarily <br />strategic placement of brush, <br />rock check dams and/or <br />countour ditches. <br />E Pyeatt Reconstruct main channel. field season Various reconstruction options <br />Repair eroded portions of side '98 are being considered. <br />channels. <br />W Pyeatt Repair eroded portions of field season <br /> channels. '98 <br />Johnson East Headcuts and scouring from field season <br /> 200 to 300 yds above LSWT '98 <br /> JE-6 downstream to JM-11. <br />Johnson Main Headcuts and scouring from field season <br /> JM-11 to spoil spring area '98 <br /> below JM-16. <br />Johnson West Road ditch above JW-18, field season <br /> channel between JW-18 and '98 <br /> JW-19, and channel leading into <br /> JW-11 are damaged in spots. <br />No Name East Channel eroded in spots from field season <br /> D Pit mine area to No Name '98 <br /> #2 pond. <br />No Name Main Headcuts and scouring between field season <br />NNW-12 and NNM-12. Occa- '98 <br />sional scouring from NNM-12 <br />to No Name #2 pond. <br />No Name West Damage in spots between field season <br />NNW-11 and NNW-12. '98 <br />Coyote East Minor erosion upstream and field season <br />downstream of CE-05. '98 <br />Coyote Main Minor erosion between CM-5 field season <br />and CM-8. Sporadic erosion '98 <br />damage between CM-9 and <br />CM-14. <br />Page 3 of 4 <br />