Laserfiche WebLink
,- ~: <br />-3- <br />STIPULATION NU. 11 <br />WITHIN ONE MONTH OF PERMIT ISSUANCE THE PERMITTEE WILL SUBMIT TO <br />THE DIVISION A PLAN FOR REGULATING PUBLIC ACCESS ALONG STATE <br />HIGHWAY 133 DURING BLASTING IN ORDER TO PROTECT THE PUBLIC. NO <br />BLASTING SHALL OCCUR UNTIL AN ACCEPTABLE PLAN HAS BEEN SUBMITTED TO <br />AND APPROVED BY THE DIVISION. <br />STIPULATION NO. 12 <br />WITHIN 6 MONTHS OF PERMIT ISSUANCE, AND PRIOR TO ROCK TUNNEL <br />DEVELOPMENT, THE PERMITTEE WILL SUBMIT TO THE DIVISION REVISED MINE <br />PLAN MAPS AND MINING PROJECTIONS WHICH ACCURATELY REFLECT THE <br />CURRENT STATUS OF MINING AT HAWK'S NEST AND THE PROJECTED EXTENT <br />AND SEQUENCE OF MINING DURING THE FIVE YEAR PERMIT TERM. <br />STIPULATION N0. 13 <br />WITHIN 6 MONTHS OF PERMIT ISSUANCE, THE RECLAMATION TIME FRAMES <br />SPECIFIED IN THE REFUSE DISPOSAL PLANS WILL BE REVISED TU <br />ACCURATELY REFLECT THE REVISED COAL WASTE AIVD ROCK WASTE VOLUME <br />PROJECTIUNS. <br />STIPULATION N0. 14 <br />THE DIVISION DIRECTS WESTERN SLOPE CARBON TU PREPARE A THOROUGH <br />GEOTECHNICAL STABILITY ANALYSIS OF THE PROPOSED kECLAIMED <br />APPROXIMATE ORIGINAL CONTOUR CONFIGURATIONS FOR THE EAST PORTAL AND <br />WEST PORTAL DISTURBANCE AREAS. THIS ANALYSIS SHALL BE COMPLETED <br />NND SUBMITTED TO THE UIVISION FOR REVIEW WITHIN 6 MONTHS FOLLOWING <br />ISSUANCE OF THE PERMIT. THE GOAL OF THIS ANALYSIS SHALL BE TO <br />DETERMINE CONFORMANCE WITH THE REQUIREMENTS OF RULE 4.27.3(3). <br />IN THE EVENT THAT THIS ANALYSIS DETERMINES THE CURRENT PROPOSED <br />RECLAIMED CONFIGURATION TO ACHIEVE A STATIC SLOPE SAFETY FACTOR OF <br />LESS THAN THE REQUIRED 1.3, THE HPPLICHNT SHALL AMEND ITS <br />RECLAMATION PLAN TO CUNTAIiV BACKFILLED CONFIGURATIONS WHICH WILL <br />ACHIEVE THE REQUIRED STATIC SLOPE SAFETY FACTOR. THE AMENDED <br />RECLAMATION PLAN AND A SUPPORTIVE STABILITY ANALYSIS SHALL BE <br />SUBMITTED TO THE DIVISION WITHIN ONE YEAR FOLLOWING ISSUANCE OF THE <br />PERMIT. <br />STIPULATION N0. 15 <br />UTILIZING RESULTS OF THE GEOTECHNICAL STABILITY NNALYSIS REQUIRED <br />BY THE PREVIOUS STIPULATION, THE PERMITTEE WILL IN CONSULTATION <br />WITH THE UIVISION DEVELOP AN ACCEPTABLE PLAN FUR INTERIM <br />STABILIZATION OF THE SLOPE ABOVE THE WEST PORTALS. THE PLAN WILL <br />BE SUBMITTED WITHIN 6 MONTHS OF PERMIT ISSUANCE ANU WILL BE <br />IMPLEMENTED WITHIN 8 MONTHS OF PERMIT ISSUANCE. <br />