Laserfiche WebLink
~j. 4: <br />-4- <br />STIPULATION N0. 16 <br />THE DIVISION DIRECTS WESTERN SLOPE CARBON TO DEVELOP A PLAN FOR THE <br />PROPER DISPOSAL OF THE COAL PROCESSING WASTE MATERIAL CURRENTLY <br />EXISTING WITHIN THE SURFACE FACILITIES AREA AT THE EAST HAWK'S NEST <br />MINE, INCLUDING, BUT NOT LIMITED T0, THE PORTAL BENCH AND WASH <br />PLAINT EMBANKMENTS. THIS PLAN SHALL DEMONSTRATE CONFORMANCE WITH <br />THE REQUIREMENTS OF RULES 4.06.2, 4.10, 4.11, 4.14, AND 4.27, AS <br />APPROPRIATE. THIS PLAN SHALL BE SUBMITTED TO THE DIVISION FOR <br />REVIEW AND APPROVAL WITHIN 6 MONTHS FOLLOWING ISSUANCE OF THIS <br />PERMIT. <br />STIPULATION NU. 17 <br />WITHIN 3 MONTHS OF PERMIT ISSUANCE THE PERMITTEE SHALL SUBMIT TO <br />THE DIVISION FUR INCORPORATION INTO THE APPLICATON, AN NCCEPTABLE <br />PLAN FUR PLACEMENT AND STORAGE OF COMBUSTIBLE WASTE, OIL AND <br />GREASE, ABANDONED MINING EQUIPMENT AND OTHER NON-COAL WASTE. THE <br />PLAN WILL ADDRESS THE ENVIRONMENTAL PROTECTION MEASURES REQUIRED BY <br />RULE 4.11.4. STORAGE AREAS WILL BE INDICATED ON A MAP OF THE <br />SURFACE FACILITIES AREA. <br />STIPULATION N0. 18 <br />WITHIN 6 MONTHS OF PERMIT ISSUANCE, THE DIVISION DIRECTS WESTERN <br />SLOPE CARBON TO PREPARE AND SUBMIT TO THE DIVISION APPROPRIATE <br />STABILITY NNALYSES OF HNY CUT SLOPE OR FILL SLOPE ADJOINING <br />ROADWAYS AT THE HAWK'S NEST MINES WHICH EXCEEU THE MAXIMUM <br />REGULATORY SLOPE LIMITS CONTAINED WITHIN RULE 4.03. THIS ANALYSIS <br />IS NUT NECESSARY FOR THE STATE HIGHWAY ROADCUTS. THE OPERATOR MAY <br />SUBMIT REPRESENTATIVE "WORST-CASE" ANALYSES, IF GEOTECHNICAL <br />ANALYSIS DEMONSTRATES THAT THE CUT SLOPE AND EMBANKMENT SLOPE <br />SITUATIONS PURPORTED TO BE REPRESENTED BY THESE ANALYSES ARE <br />ANALOGOUS. <br />STIPULATION NO. 19 <br />WITHIN 2 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT TO <br />THE DIVISION AN ACCEPTNBLE PLAN FOR SNOW REMOVAL AND DISPOSAL, TO <br />INSURE THAT SNOW AND ROAD SURFACE MATERIAL IS DISPOSED OF IN AN <br />APPROPRIATE AREA AND DOES NUT INTERFERE WITH SURFACE DRAINAGE. <br />STIPULATION NO. 20 <br />BOND IN THE AMOUNT OF $563,000.00 MUST BE SUBMITTED TO THE DIVISION <br />WITHIN 30 DAYS OF THE FIRST NOTICE OF PROPOSED DECISION <br />PUBLICATION, AND MUST BE SUBMITTED PRIOR TO PERMIT ISSUANCE. <br />