Laserfiche WebLink
,. • ~= <br />-z- <br />STIPULATION N0. 5 <br />WITHIN THREE MONTHS OF PERMIT ISSUANCE THE PERMITTEE WILL INSTALL <br />AND BEGIN MONTHLY MONITORING OF A MONITORING WELL IN THE NORTH FORK <br />NLLUVIUM, NUT MORE THAN 100 FEET DOWNSTREAM OF THE LOADUUT SEDIMENT <br />POND. THIS WELL WILL BE MONITORED MONTHLY FOR GROUND WATER LEVELS, <br />PH, ELECTRO-CONDUCTIVITY, AND TEMPERATURE, AND QUARTERLY FUR THOSE <br />WATER QUALITY PARAMETERS REQUIRED BY THE DIVISION. ALL ANALYSES <br />WILL BE SUBMITTED TO THE DIVISION WITHIN ONE MONTH OF COLLECTION. <br />STIPULATIUN N0. 6 <br />AT THE END OF EACH CALENDAR YEAR, THE PERMITTEE WILL SUBMIT TO THE <br />DIVISION AN ANNUAL HYDROLOGIC REPORT. THIS ANNUAL REPORT SHALL <br />INCLUDE: 1) AN ANALYSIS OF ALL SURFACE ANU GROUND WATER DATA <br />COLLECTED DURING THE YEAR, 2) AN ANALYSIS OF IMPACTS THE MINE IS <br />HAVING UN THE HYDROLOGIC ENVIRONMENT, AND 3) A STATEMENT EXPLAINING <br />THOSE MEASURES (IF ANY) THE APPLICANT IS TAKING TO MINIMIZE THE <br />IMPACTS OF THE MINING OPERATION ON QUALITY AIJD QUANTITY OF SURFACE <br />AND GROUND WATERS. <br />STIPULATION N0. 7 <br />AS MINING PROGRESSES IN ALL COAL SEAMS WITHIN THE HHWK'S (VEST <br />MINES, THE PERMITTEE WILL OBTAIN WATER RIGHTS TO ALL MINE INFLOWS <br />TO INSURE NO INJURY IS INCURRED BY OTHER WATER RIGHTS HOLDERS <br />WITHIN THE BASIN OF THE NORTH FORK OF THE GUNNISON UPON THE <br />CESSATION OF MINING. THE DIVISION WILL BE SENT COPIES OF ALL <br />ADDITIONAL WELL PERMITS, CHANGE OF USE PERMITS, ETC. APPLIED FOR <br />AND/UR RECEIVED BY THE PERMITTEE. <br />STIPULATION N0. 8 <br />WITHIN 12 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL PROPOSE <br />ACCEPTABLE STANDARDS FOR HERBACEOUS COVER, PRODUCTION AND SPECIES <br />DIVERSITY OR LOCATE APPROPRIATE REFERENCE AREAS AND SUBMIT <br />ACCEPTABLE SAMPING DATA TO THE DIVISION TO BE USED IN EVALUATIONS <br />OF REVEGETATION SUCCESS. <br />STIPULATION N0. 9 <br />WITHIN 6 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL IDENTIFY AN <br />ACCEPTABLE REFERENCE AREA AS DESCRIBED IN THE APPLICATION OR SUBMIT <br />TU THE DIVISION AN ACCEPTABLE ALTERNATIVE REVEGETATION SUCCESS <br />STANDARD FOR THE HOTCHKISS COAL PROCESSING WASTE DISPOSAL SITE. <br />STIPULATIUN NU. lU <br />WITHIN 3 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT <br />INFORMATION TO THE DIVISION VERIFYING THAT EXISTING POWER LINES AND <br />TRANSMISSION FACILITIES ARE CONSTRUCTED AS REQUIRED BY RULE 4.18 TU <br />INSURE THE PROTECTION OF LARGE RAPTORS. <br />