Laserfiche WebLink
L` <br />ATTACHMENT A <br />Stipulations <br />STIPULATION No. 1 <br />WITHIfV THREE MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL LINE <br />BOTH LIMBS OF THE EAST AND WEST MINE DIVERSIONS WITH COMPETENT ROCK <br />RIPRAP WITH A D50 OF NOT LESS THAN SIX INCHES IN ORDER TO PREVENT <br />EXCESSIVE EROSION OF THE CHNNNELS, OR PROVIDE APPROPRIATE <br />CALCULATIONS WHICH DUCUMEfVT NON EROSIVE VELOCITIES. <br />STIPULATION N0.L <br />AT THE END OF EACH CALENDAR YEAR, THE PERMITTEE WILL SUBMIT TU THE <br />DIVISION AN ANNUAL REPORT OF MIfVE INFLOWS, DISCHARGES, AND WATER <br />CONSUMPTION. THIS REPORT IS TO INCLUDE A MINE WORKINGS MAP FOR <br />EACH COAL SEAM MINED SHOWING THE LOCATION AND QUANTITY OF INFLOW; <br />A TABLE KEYED TO THE MINE MAPS WHICH SHALL CONTAIN THE SOURCE, <br />(i.e. FAULTS, FRACTURES, ETC.) QUANTITY, DURATION, AND QUALITY <br />(i.e. pH, ELECTRO-CONDUCTIVITY AND TEMPERATURE) OF ALL INFLOWS; A <br />TABLE CONTAINING RECORDS OF WATER DISCHARGED FROM THE MINE, <br />CONSUMED IN THE MINE AND IMPORTED FOk USE WITHIN THE MINE; A <br />DISCUSSION OF THE WATER BALANCE WITHIN THE MINE; AND FINALLY A <br />PROJECTION OF HYDROLOGIC IMPACTS OF MINING FUR THE UP-COMING YEAR. <br />STIPULATION No. 3 <br />THE PERMITTEE WILL CONTINUE THE MONTHLY MONITORING OF SPRING FLOW <br />RHTES, PH, ELECTRO-CONDUCTIVITY AND TEMPERATURE OF SPRINGS WITHIN <br />THE PERMIT AND ADJACENT AREAS (EXCEPT DURING PERIODS OF SNOW <br />COVER). THIS DATA SHALL BE SUBMITTED TO THE DIVISION ON A <br />QUARTERLY BASIS. <br />STIPULATION N0. 4 <br />THE PERMITTEE WILL CONTINUE TO MONITOR ON A QUARTERLY BASIS GROUND <br />WATER LEVELS, PH, ELECTRO-CONDUCTIVITY AND TEMPERATURE FOR WATER <br />FROM 1) SLURRY DISPOSAL AREAS WITHIN THE MINE, 2) MONITORING WELLS <br />WITHIN THE MINE, 3) MONITORING WELLS AT THE ANTHRACITE CREEK <br />DISPOSAL AREA, AND 4) AT THE HOTCHKISS DISPOSAL AREA. A COMPLETE <br />WATER CHEMISTRY ANALYSIS SHALL BE CONDUCTED FOR THOSE CHEMICAL <br />PARAMETERS REQUIRED BY THE DIVISION ON THE AFOREMENTIONED SITES ON <br />A BIANNUAL BASIS (MAY AND OCTOBER). ALL ANALYSES WILL BE SUBMITTED <br />TO THE DIVISION WITHIN ONE MONTH OF COLLECTION. <br />