Laserfiche WebLink
_.. ... <br />Stipulation 11 <br />THE METHOD OF DETERMINING THE SUCCESS OF REVEGETATION AND THE VALUES FOR <br />STANDARDS FOR VEGETATION COVER, PRODUCTION, WOODY PLANT DENSITY, AND <br />DIVERSITY HAS NOT BEEN ESTABLISHED BY THE DIVISION, BUT WILL REMAIN A <br />PART OF THE PERMIT PENDING FURTHER REVIEW. THE DIVISION WILL ESTABLISH <br />SUCH METHODS AND STANDARDS WITHIN 60 DAYS OF PERMIT ISSUANCE. <br />Stipulation No. 12 <br />WITHIN 120 DAYS OF PERMIT ISSUANCE, THE PERMITTEE SHALL PROVIDE TO THE <br />DIVISION AN ANNUAL OR BIENNIAL REVEGETATION MONITORING PLAN TO BE <br />IMPLEMENTED POST-SEEDING. THE DIVISION SHALL REVIEW THE PLAN AND <br />DETERMINE WHETHER IT IS ACCEPTABLE PRIOR TO THE PERMITTEE BEING RELIEVED <br />OF THE REQUIREMENTS OF THIS STIPULATION. <br />Stipulation No. 13 <br />THE DIVISION REQUIRES THAT FENCING SHALL BE ACCOMPLISHED WITHIN THE <br />CONFINES OF THE PERMIT AREA TO PREVENT GRAZING OF REVEGETATED AREAS FOR <br />A TIME NOT LESS THAN THREE YEARS AFTER THE INITIAL SEEDING. INFORMATION <br />FROM THE MONITORING PROGRAM TO BE CONDUCTED WILL ALLOW THE DIVISION TO <br />DETERMINE WHETHER TO ALLOW GRAZING AFTER THAT TIME. <br />Stipulation No. 14 <br />1. THE PERMITTEE IS REQUIRED TO SUBMIT TO THE DIVISION A CERTIFIED <br />REPORT FROM THE SUPERVISING REGISTERED PROFESSIONAL ENGINEER, CERTIFYING <br />THAT BACKFILLING AND GRADING AT THE PORTAL AND ADIT AREAS HAS BEEN <br />COMPLETED AS APPROVED IN THE PERMIT AND THAT THE RESULTING SLOPES ARE <br />STABLE. THIS REPORT SHOULD INCLUDE A SUP1MARY OF THE SUPERVISING <br />ENGINEER'S OBSERVATIONS AND OPINIONS ON THE BACKFILLED AREAS AND SHOULD <br />BE SUBMITTED WITHIN 30 DAYS OF COMPLETION OF BACKFILLING AND GRADING.. <br />2. THE PERMITTEE SHALL SUBMIT A FINAL POST-MINING TOPOGRAPHIC MAP (0N <br />FIVE FOOT CONTOUR INTERVALS OR LESS) WITHIN 30 DAYS FOLLOWING FINAL <br />GRADING PREPARED BY A REGISTERED LAND SURVEYOR WHICH CERTIFIES THAT THE <br />APPROVED POST-MINING APPROXIMATE ORIGINAL CONTOUR HAS BEEN ACHIEVED. <br />3. THE PERMITTEE IS REQUIRED TO SUBMIT A PLAN FOR MONITORING OF THE <br />BACKFILLED PORTAL AREAS TO VERIFY THE BACKFILLED SLOPE STABILITY. THIS <br />PLAN MUST BE SUBMITTED TO AND APPROVED BY THE DIVISION PRIOR TO <br />COMPLETION OF THE GRADING WORK SO THAT THE PROGRAM CAN BE IMPLEMENTED <br />UPON FINAL GRADING AT NORTHERN N0. 1 AND RIENAU NO. 2 PORTAL AREAS. THE <br />PERMITTEE IS REQUIRED TO SUBMIT ANNUAL REPORTS SUMMARIZING THE PRIOR <br />YEAR'S OBSERVATIONS UNTIL SUCH TIME AS THE DIVISION RELIEVES THE <br />PERMITTEE OF THIS REQUIREMENT IN WRITING. A SPECIFIC DATE FOR ANNUAL <br />REPORT SUBMITTAL WILL BE IMPOSED AT SUCH TIME AS THE MONITORING PROGRAM <br />IS APPROVED. <br />