My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL36584
DRMS
>
Back File Migration
>
General Documents
>
GENERAL36584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:04 PM
Creation date
11/23/2007 8:47:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
General Documents
Doc Date
2/8/1985
Doc Name
MINING PERMIT (Dated 1/4/85 to 1/3/90)
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~' 1,_ <br />Stipulation No. 15: <br />THE PERMITTEE MUST COMPLETE RECLAMATION AT <br />AND FACILITIES WITHIN TWO YEARS OF PERMIT <br />THE APPROVED MINE PLAN AND STIPULATIONS. <br />Stipulation No. 16 <br />THE NORTHERN N0. 1 MINE SITE <br />ISSUANCE, IN ACCORDANCE WITH <br />WITHIN 6 MONTHS OF PERMIT APPROVAL, THE PERMITTEE MUST INSTALL A 21 INCH <br />OR LARGER CULVERT AT STATION 12+50 OF THE NORTHERN N0. 1 HAUL ROAD. IN <br />ADDITION, THE PERMITTEE MUST SUBMIT A PLAN FOR DIVISION) APPROVAL TO <br />BRING THE EIGHT 36 INCH CULVERTS AT STATION 31+50 OF THE NORTHERN N0. 1 <br />HAUL ROAD INTO COMPLIANCE WITH THE SIZING REQUIREMENTS OF RULE <br />4.03.1(4)(e)(i), THE PLAN MUST BE IMPLEMENTED WITHIN 30 DAYS OF <br />DIVISION APPROVAL. <br />Stipulation No. 17 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE THE PERMITTEE MUST EITHER REVISE THE <br />RECLAMATION PLAN TO INCLUDE REMOVAL AND RECLAMATION OF THE NORTHERN N0. <br />1 HAUL ROAD AND THE WILSON-LOUDY LOAD-OUT HAUL ROAD OR SUBMIT THE <br />INFORMATION REQUIRED BY RULE 2.05.5 FOR POST-MINING LAND USE CHANGE. <br />Stipulation No. 18 <br />WITHIN FIVE (5) DAYS AFTER THE APPROVAL OF THE PERMIT APPLICATION, AND <br />PRIOR TO THE ISSUANCE OF THE PERMIT AN ACCEPTABLE BOND IN THE AMOUNT OF <br />X850,000.00 MUST BE DEPOSITED WITH THE DIVISION IN ACCORDANCE WITH CRS <br />34-33-113. <br />Stipulaton No. 19 <br />THE PERMITTEE MUST PRESENT PLANS SHOWING HOW MINE OPENINGS WILL BE <br />HYDRAULICALLY SEALED TO PREVENT UNCONTROLLED MINE DISCHARGES UPON <br />COMPLETION OF MINING. THIS PLAN SHALL BE SUBMITTED TO THE DIVISION FOR <br />ITS APPROVAL WITHIN 90 DAYS OF THE ISSUANCE OF THIS PERMIT DOCUMENT. <br />Stipulation No. 20 <br />THE PERMITTEE SHALL COMPLETE ALL RECLAMATION ACTIVITIES AT THE <br />WILSON-LOUDY LOAD-OUT SITE BY NOVEMBER 15, 1984. THESE ACTIVITIES SHALL <br />INCLUDE BUT NOT BE LIMITED TO BACKFILLING AND GRADING, TOPSOILING, <br />SEEDING AND MULCHING, REMOVAL OF ACCUMULATED COAL, AND MAINTENANCE AND <br />CONSTRUCTION OF SEDIMENT CONTROL AND ROAD FACILITIES. <br />
The URL can be used to link to this page
Your browser does not support the video tag.