.~, <br />Stipulation No. 8 <br />THE DIVISION REQUIRES THAT THE PERMITTEE SUBMIT: <br />(1) A SPECIFIC AUGMENTATION PROGRAM WHEREBY WATER WILL BE STORED IN ONE <br />EASILY-MAINTAINED RESERVOIR, SUCH AS JENSON N0. 1, DURING THE HIGH FLOW <br />MONTHS. A MAINTENANCE PROGRAM MUST BE DESCRIBED WHEREBY THE STORAGE OF <br />12.7 ACRE FEET CAN BE RELEASED AT INTERVALS DURING THE LOW FLOW MONTHS <br />OF JULY TO MID-OCT08ER; <br />{2) THE METHOD AND THE DESIGN OF RELEASE STRUCTURES ON THE RESERVOIR <br />MUST BE DESCRIBED; <br />(3) A METHOD OF GAGING THE SEDIMENT LEVEL IN THE RESERVOIR SHALL BE <br />INSTALLED AND THE SEDIMENT LEVELS SHALL BE MONITORED MONTHLY; <br />(4) SEDIMENT SHALL BE REMOVED TO MAINTAIN AN 12.7 ACRE FOOT WATER <br />STORAGE CAPACITY AT ALL TIMES; <br />(5) THE AUGMENTATION PROGRAM MUST BE ADDRESSED BY THE PERMITTEE AT LEAST <br />SIXTY DAYS BEFORE PUMPAGE OF WATER IS CEASED FROM THE RIENAU N0. 2 MINE; <br />(6)THE AUGMENTATION PROGRAM WILL NEED TO REMAIN IN EFFECT UNTIL SUCH <br />TIME THAT MONITORING SHOWS EQUILIBRIUM HAS BEEN REACHED IN THE "G" SEAM <br />AND NO FURTHER DEPLETION OF THE CURTIS CREEK SURFACE WATER SYSTEM IS <br />OCCURRING. <br />Stipulation No. 9: <br />WITHIN 90 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST REVISE THE RIENAU <br />NO. 2 RECLAMATION PLAN, TO INCLUDE AT A MINIMUM THE AMOUNT OF TOPSOIL <br />STOCKPILED NEAR THE SEDIMENT PONDS, IF ANY; THE PROPOSED TOPSOIL <br />REPLACEMENT DEPTH, IF ANY IS AVAILABLE; AND ANALYSIS OF REPRESENTATIVE <br />SAMPLES OF THE IN-PLACE MATERIAL AT 7HE MINE SITE FROM A MINIMUM OF FOUR <br />SITES. AT EACH SITE, SAMPLES MUST BE TAKEN AND ANALYZED FOR THE <br />FOLLOWING PARAMETERS. <br />ELECTRICAL CONDUCTIVITY <br />pH <br />CALCIUM <br />MAGNESIUM <br />SODIUM <br />SODIUM ABSORPTION RATIO <br />PERCENT ORGANIC MATTER <br />SATURATION PERCENTAGE <br />TEXTURAL ANALYSIS <br />IF THE IN-PLACE MATERIAL PROVES UNSUITABLE AS A PLANT GROWTH MEDIUM, OR <br />IF AN APPROPRIATE DEPTH OF TOPSOIL IS UNAVAILABLE, THE PERMITTEE MUST <br />SUBMIT AN PLAN WHEREBY SUITABLE PLANT GROWTH MATERIAL WILL BE SUPPLIED. <br />Stipulation No. 10 <br />THE PERMITTEE MUST SUBMIT A REVISED VEGETATION PLAN TO INCORPORATE THE <br />MODIFICATIONS REQUESTED BY THE DIVISION FOR SCHEDULED TIME FOR <br />REVEGETATION, SEED MIXES, METHOD OF APPLICATION, AND MULCHING. THIS <br />PLAN MUST BE SUBMITTED TO THE DIVISION WITHIN 60 DAYS OF PERMIT ISSUANCE. <br />