Laserfiche WebLink
• <br />EXHIBIT 29 <br />-3- <br />G.E.C. Bond Reevaluation <br />Number <br />I. <br />.~ II. <br />~' III. <br />~ IV. <br />~ y <br />VI <br />~ VII <br />VIII <br />IX <br />- ~ X <br />Reevaluation <br />Permitted Cost <br />Area Cost August 75. 1983 <br />Tipple Area 516,878 S 16,878 <br />Maintenance Shop 346 -- <br />Orphan Mine 16,045 1,605 <br />North Orphan Mine 14,259 <br />Refuse Area 5,382 <br />Nine Area 'L/{1 441,358 <br />Miscellaneous Area 24,565 <br />Prospecting Pit 11,892 <br />Diversion Ditch <br />Area For. <br />Prospecting Pit 3,459 <br />Sediment Control 1,801 <br />Magpie Creek <br />Diversion Channel/ <br />Original <br />Restoration 5,917 <br />XI. Un-named Stream 2,341 <br />Total Available Performance Bond <br />2,852 <br />5,382 <br />673,122 <br />24,5b5 <br />7,810_ <br />3,459 <br />7,801 <br />5,917 <br />£ 2.341 <br />5745,738 <br />53S 4.000 <br />5217,738 deficit <br />Reference <br />Exhibit 21 <br />(not constructed) <br />Exhibit 21/ <br />Revised 8/15/83 <br />Exhibit 21/ <br />Revised 8/15/83 <br />Exhibit 21 <br />Exhibit Zi/* <br />Exhibit 21 <br />Exhibit 21/ <br />Revised 8/15/83 <br />Exhibit 21 <br />Exhibit 21 <br />Exhibit 21 <br />Exhibit 21 <br />