WeII Field Service Road <br />Cut =156,176 cy <br />Fill = 234,096 cy <br />Temporary Roads in 0-5 year mine panel <br />Cut =112,440 cy <br />Fi11= 49,389 cy <br />The road and piping system for the areas beyond the 0-5 year panel will not be <br />defined. We suggest that, if you believe it necessary to estimate cut and fill volumes <br />and detailed disturbance for the future panels, the 0-5 year numbers can be ratioed to <br />the total panel size to yield disturbance ar cut and fill per acre. These ratios can then <br />be applied to the size of the future panels. This approach should be representative <br />of the level of disturbance. <br />15. Temporary and permanent access roads present the single greatest potential impact to <br />soils and vegetation due to the complete clearing of vegetation and increased potential for soil <br />erosion. We need a reasonably estimated area of disturbance for access roads to quantify <br />impacts. <br />The following are estimated disturbances by category and include consideration of <br />cut and fill slopes. Well field-related disturbances are for the 0-5 year panel only. <br />Additional disturbance far construction is also estimated and includes such <br />considerations as temporary earth storage, laydown areas, and topsoil and timber <br />stockpiling. The well field-related construction disturbances are probably <br />conservative because future pad areas can be used to reduce temporary disturbances <br />for construction stockpiling. <br />7 <br />