My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35465
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35465
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:26 PM
Creation date
11/23/2007 8:20:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984067
IBM Index Class Name
General Documents
Doc Date
7/2/1988
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-8- <br />Stipulation No. 19 <br />PRIOR TO THE DIVISION APPROVING THE SMALL AREA EXEMPTION, THE APPLICANT <br />MUST COMMIT TO NO COAL STORAGE IN THIS AREA OR DEMONSTRATE THAT IN <br />GRANTING THIS SMALL AREA EXEMPTION THERE WILL BE NO INCREASE IN SUSPENDED <br />SOLIDS OUTSIDE THE PERMIT AREA. <br />Status: This stipulation has been satisfied as a result of the issuance <br />of NOV C-86-025 and then CO C-86-031 and subsequent abatement of the CO <br />submitted and approved in MR-05. <br />Stipulation No. 20 <br />IN ORDER TO DETERMINE THE SURFACE EFFECTS OF SUBSIDENCE, A SUBSIDENCE <br />MONITORING PLAN, AS OUTLINED IN FIGURE NO. 1, WILL BE IMPLEMENTED. THE <br />MONUMENTS WILL BE ESTABLISHED AS ILLUSTRATED IN FIGURE N0. 2. <br />ALL MONUMENTS WILL BE SURVEYED TWICE PRIOR TO POSSIBLE SUBSIDENCE. <br />THEREAFTER, SEMI-ANNUAL SURVEYS WILL BE MADE. THIS DATA WILL BE REPORTED <br />GRAPHICALLY AS CROSS SECTIONS AND SUBSIDENCE PROFILES. <br />THE SUBSIDENCE REPORTS WILL BE SUBMITTED TO THE DIVISION ANNUALLY ALONG <br />WITH THE REQUIRED HYDROLOGY INFORMATION DISCUSSED ABOVE. <br />Status: This stipulation was modified in MR-06 into a commitment <br />inserted into the permit application in Exhibit 17. The mine has <br />committed to placing the subsidence monuments within eight months of <br />entry development. <br />Stipulation No. 22, TR-04 <br />"WITHIN ONE (1) MONTH OF COMPLETION OF CONSTRUCTION OF THE COAL GULCH <br />PERMANENT CHANNEL, THE PERMITTEE MUST SUBMIT TO THE DIVISION A CERTIFIED <br />STATEMENT BY A REGISTERED PROFESSIONAL ENGINEER THAT THE CONSTRUCTION OF <br />THE PERMANENT CHANNEL MEETS THE SPECIFICATIONS OF THE APPROVED DESIGN." <br />Status: The requirements of this stipulation have been satisfied and the <br />certified map has been placed into the permit application. <br />Stipulation No. 23, MR-04 <br />"WITHIN 30 DAYS OF APPROVAL (THAT IS, BY SEPTEMBER 17, 1986), PEERLESS <br />RESOURCES, INC., MUST SUBMIT A REVISED MAP 12 IN COMPLIANCE WITH THE <br />REQUIREMENTS OF RULE 2.10 AND REVISED PAGES OF THE PERMIT APPLICATION <br />DOCUMENT TO REFLECT CHANGES CREATED BY THE APPROVAL OF MINOR REVISION N0. <br />4." <br />
The URL can be used to link to this page
Your browser does not support the video tag.