Laserfiche WebLink
-6- <br />Stipulation No. 9 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST SUBMIT A <br />PLAN TO PREVENT SEEPAGE FROM COAL GULCH THROUGH THE BERM INTO THE <br />FACILITIES AREA. THIS PLAN MUST BE APPROVED BY THE DIVISION AND <br />IMPLEMENTED PRIOR TO COMMENCEMENT OF MINING. <br />Status: This stipulation has been satisfied as an abatement to <br />NOV C-86-005. This was submitted as Minor Revision (MR)-03. <br />Stipulation No. 10 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST SUBMIT TO <br />THE DIVISION FOR APPROVAL, A PLAN FOR RECLAMATION OF THE COAL GULCH <br />DIVERSION AND PLANS FOR RE-ESTABLISHMENT OF THE PERMANENT POST-MINING <br />COAL GULCH CHANNEL. THE DESIGNS MUST BE APPROVED IN WRITING BY THE <br />DIVISION PRIOR TO THIS STIPULATION BEING SATISFIED. <br />Status: This stipulation has been satisfied as an abatement to <br />NOV C-86-047 as TR-04. <br />Stipulation No. 11 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST SUBMIT TO <br />THE DIVISION A PLAN FOR EROSION CONTROL OF THE TEMPORARY COAL GULCH <br />DIVERSION ADEQUATE TO HANDLE THE VELOCITIES OF THE 10-YEAR, 24-HOUR <br />STORM. THIS PLAN MUST BE APPROVED PRIOR TO IMPLEMENTATION. <br />Status: This stipulation has been satisfied as an abatement to <br />NOV C-86-047 as TR-04. <br />Stipulation No. 12 <br />THE APPLICANT MUST SUBMIT ADEQUATE DESIGNS FOR THE CULVERT CONVEYING <br />FLOWS FROM THE COAL GULCH DIVERSION UNDER THE HAUL ROAD WITHIN <br />THIRTY (30) DAYS OF PERMIT ISSUANCE. THESE DESIGNS MUST BE APPROVED BY <br />THE DIVISION PRIOR TO ANY HAUL ROAD CONSTRUCTION. <br />Status: This stipulation has been satisfied as an abatement to <br />NOV C-86-047 as TR-04. <br />Stipulation No. 13 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE AND PRIOR TO ANY ADDITIONAL <br />DISTURBANCE, THE APPLICANT MUST SUBMIT TO THE DIVISION FOR APPROVAL <br />DESIGNS FOR THE WEST DITCH ADEQUATE TO PASS THE FLOWS FROM A 10-YEAR <br />24-HOUR STORM. THE DESIGNS MUST BE APPROVED IN WRITING BY THE DIVISION <br />PRIOR TO THIS STIPULATION BEING SATISFIED. <br />Status: This stipulation has been satisfied as an abatement to <br />NOV C-86-047 as TR-04. <br />