the three shrub pazcels, and monitoring ground stability on the slump parcel,23 <br />Reclaimed Areas of Previous Bond Releases <br />All of the 362 acres that had been disturbed were granted Phase I bond release, all except 8.9 <br />acres were granted Phases II and III bond release; and all but the 8.9 acres of the 1,276 acres have <br />been removed from the permit azea24. The 8.9 acres were retained to insure successful <br />revegetation (shrub augmentation) of the three shrub parcels, and to demonstrating ground <br />stability25 in the slump parcel. <br />A Partial Phase I release (Bond Release SL-O1) was approved in 1988 for 319 acres east of RCR <br />53. This included the azeas of Parcels HG-3, E, and Slump. <br />A Partial Phase I release (Bond Release SL-02) was approved in 1997 for 45.1 acres west of <br />RCR 53. This included Pazce1003. <br />A Partial Phase II and Phase III (Bond Release SL-03) was approved for 357.3 acres (both east <br />and west of RCR 53). As explained above, Pazcels 003, HG-3, E and Slump were not included in <br />this bond release. <br />Reclamation History of Areas of this Bond Release Request <br />The Paroel HG-8 area was reclaimed and originally revegetated in 1982 as a part of the mine pit <br />reclamation (1986). This parcel was included in the Partial Phase I release (Bond Release SL-O1) <br />approved in 1988 for 319 acres east of RCR 53. Shrub augmentation seedling plantings occurred <br />in 1996 and 1997. <br />The Parcel E area was reclaimed and originally revegetated in 1984 as a part of the mine pit <br />reclamation (1986). This parcel was included in the Partial Phase I release (Bond Release SL-Ol) <br />approved in 1988 for 319 acres east of RCR 53. Shrub augmentation seedling plantings occurred <br />in 1996 and 1997. <br />The Slump azea was reclaimed and originally revegetated in 1986 as a part of the mine pit <br />reclamation. This parcel was included in the Partial Phase I release (Bond Release SL-O1) <br />approved in 1988 for 319 acres east of RCR 53. In 1992, a slump developed neaz the highwall. <br />Slump stability work, which included installation of underground drains, minor grading, and <br />seeding, was accomplished in 1994. Additional stabilization work was required in 1996, and <br />additional seeding was accomplished in 1998. Continued compliance of the remedial work with <br />Phase I Bond Release criteria is validated in this application. <br />zs Technical Revision 68 Preface <br />24 Technical Revision 68, January 13, 2000 <br />zs Division letter of June 29, 1999, Re: Hayden Gulch Mine (Permit No. C-8-003), Cessation of <br />water monitoring program <br />Hayden Gulch Mine Page 7 July 31, 2006 <br />SL-04 <br />