My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35449
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:25 PM
Creation date
11/23/2007 8:20:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
General Documents
Doc Date
12/14/1984
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-10- <br />2. QUARTERLY MONITORING OF THE HARVEY GAP RESERVOIR SEEP INCLUDING <br />FLOW AND FIELD PARAMETERS. <br />3. COMPILATION OF ALL DATA SUBMITTED TO THE COLORADO DEPARTMENT OF <br />HEALTH FOR COMPLIANCE WITH THE NPDES PERMIT SAMPLING REQUIREMENTS, <br />INCLUDING SALINITY. <br />GROUND WATER <br />1. CONTINUATION OF AN INFLOW STUDY AT THE MINE WITH THE SOURCES OF <br />SEEPS MAPPED ONCE YEARLY. FLOWS AND FIELD PARAMETERS SHALL BE SAMPLED <br />AS PRACTICABLE. A HEAVY INFLOW MONTH SUCH AS JULY WILL BE CHOSEN FOR <br />INFLOW MAPPING. ANY NEWLY DEVELOPED SOURCES OF INFLOW THAT HAVE FLOW <br />OF 0.5 GPM OR GREATER WILL BE TESTED ONE-TIME FOR THE FULL SUITE OF <br />CHEMICAL PARAMETERS. <br />2. PUMPAGE RATES FROM THE MINE TO THE SEDIMENT PONDS WILL BE RECORDED <br />WITH THE MINE WATER TESTED QUARTERLY FOR FIELD PARAMETERS AND ONCE <br />YEARLY FOR THE FULL SUITE OF CHEMICAL PARAMETERS. <br />3. THE MINE WELLS 0.5 AND 1.5 COMPLETED IN THE COAL SEAMS OVERLYING <br />THE E SEAM WILL BE SAMPLEU ON A QUARTERLY BASIS FOR WATER LEVEL AND <br />FIELD PARAMETERS. <br />4. A WELL WILL BE PLACED AT THE PROJECTED BASE OF THE REFUSE PILE AND <br />COMPLETED IN THE ALLUVIUM. THIS WELL MUST BE COMPLETED PRIOR TO <br />DISTURBANCE AT THE REFUSE WASTE SITE. COMPLETION DIAGRAMS SHOULD BE <br />SUBMITTED TO THE DIVISION WITHIN 30 DAYS OF COMPLETION. THIS WELL WILL <br />BE SAMPLED ;~IONTHLY FOR WATER LEVEL AND FIELD PARAMETERS AND QUARTERLY <br />FOR FULL SUITE CHEMICAL PARAMETERS. <br />FIELD PARAMETERS <br />TEMPERATURE <br />pH <br />CONDUCTIVITY <br />FLOW OR WATER LEVEL <br />logic Balance -- Sediment Cont <br />FULL SUITE CHEMICAL PARAMETER <br />pH <br />TEMPERATURE <br />SPECIFIC CONDUCTANCE <br />D[SSOLUED SOLIDS <br />SODIUM <br />POTASSIUM <br />CALCIUM <br />-- Ru <br />MAGNESIUM <br />SULFATE <br />FLUORIDE <br />BORON <br />ALKALINITY <br />BICARBONATE <br />4.05.4. 4.05 <br />Information on the sediment control measures and structure designs is <br />presented on pages 62 to 95 and Appendix F of the permit application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.