Laserfiche WebLink
Ms. Welt <br />Page 5, <br />applicant submits a permit application to undermine the Dry Fork of <br />Minnesota Creek, the subsidence protection plan shall be based upon <br />monitoring information collected during the earlier phases of <br />mining." Matthew Hayes, previously with MLRD, recommended that <br />this stipulation be terminated because it had been incorporated <br />into the permit on page 3-79. However, this stipulation has been <br />omitted from the new permit document. MCC should incorporate this <br />stipulation into the new permit which would allow the Division to <br />terminate it, or the status will remain as future. <br />3. Stipulation 5 from the 1986 Permit Renewal requires MCC to seed <br />topsoil stockpiles that will not be disturbed for five or more <br />years with the permanent seed mix (excluding shrubs) and not the <br />temporary seed mix. Mr. Hayes suggested that this stipulation <br />could be terminated if MCC chooses to change the tense of a <br />sentence on page 2.05-39, so that the sentence reads as a <br />commitment rather than a statement of fact. The sentence presently <br />reads, "Topsoil stockpiles in place for five years or more have <br />been seeded with the permanent seed mix described in Table 48..." <br />MCC should revise this sentence so that is states, "Topsoil <br />stockpiles that will not be redistributed for five or more years <br />will be seeded with the permanent seed mix (see Table 48), <br />excluding shrubs, and not the temporary seed mix." Once this <br />/change is made the Division will terminate this stipulation. <br />,/ 4: Stipulation 33 from the original application required MCC to <br />~omplete Phase II of geotechnical and hydrologic studies of the ~c(. 5 <br />initial waste pile. Has this been completed? The Division ~ 7~ <br />requests MCC's assistance in locating this information if the Z~' <br />s ud~ies have been omp eted.,r2p ~(~G2~- Z %09 ~%~ ~ ~Ud,3 to Pi ~Z - l'IG <br />~~~c vL~ Strop bvvrc~ -~l} ~,~ste ~,~5 rP`d~r~ve~ b~-fore ~aKS~ruc-~rooi o~~~' ~ l°fr <br />~/ ~ ~~ C5. Stipulation 34 from the original permit application requires ~o? d <br />~{~ ~ICG„to complete a preliminary stability evaluation for the upper <br />~~~yy,,~~~~~ e rock pile, to complete a thorough geotechnical analysis and <br />~~1{M~~~p~~~detailed engineering design and plans for the pile and the access ~ <br />~d 1 road to the pile, and to supply the Division with copies of the,~'~(~~iwlt <br />11 report and detailed design narrative, plans, and cross-sections in <br />s`~.rl ~~ ~/'~t~e permit application. The stipulation also states that no Ww.l,~~~lllI <br />~'XL "COnStrllctlon shall commence on the pile or road until approval by t1F'~ <br />~~ ~,S the Division, of the required geotechnical analyses and detailed~~~~~ <br />engineering designs. Has all this been approved? Has the ~I <br />S~1 ~df~ preliminary stability evaluation been completed? When? (I believ <br />~t ISr~ andtllofromfthe119861PermitoRenewabeenleaseaverifY stiTheaDivision P~ ~r <br />~5 d~ d~ P Y • ) ~~~ )~ <br />/~•~~ requests MCC's assistance is reconciling this stipulation. <br />~( Vy, ~ 6 The Division re ' <br />u quests MCC s assistance regarding Stipulation 12 <br />~r Stipulation 13 from Permit Revision 4 or Stipulation 41 from <br />ti~o~^ the original permit document), which requires complete installation <br />l~. i~~' ~ly of a subsidence monitoring network prior to extraction of coal within <br />~~`~ ~~ J ~UI~Si ~ti(C.e Guv~~~~p~~l:in„ Re~c~r~, <br />,Su ~~~ti~, rvtS~LI ~~ ~a II f K ~'~ _ '"7 <br />G ~ rc~1 ~cd (~Cd~L-~v4'~ a~ sub W1d~.~~ <br />P~- ~~{ - ~d ~~ ~L o ~ ~~~-s -F~ ~- Vv(j vt r ~ 1. <br />