My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35272
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:20 PM
Creation date
11/23/2007 8:16:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
General Documents
Doc Date
11/21/1995
Doc Name
FAS COVER-ATTACHED LETTER AND CLEAN-OUT PLAN
From
DUFFORD & BROWN PC
To
CARL MOUNT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENT BY~Xerox Telecopier 7021 .11-21-85 ~ 7~37PM ~ ... 30383 ~804y 303 B32 6106.~R 4 <br />~ ~ ~._. <br />The tai] <br />will be <br />tank. L <br />;s then will be <br />•ough a 3"-4" n <br />charge into the <br />has been provi <br />~ of the job.) <br />led up the road to the tailings pond for discharge. Discharge <br />x hose connected to the discharge valve at the bottom of the <br />ngs pond will be by gravity feed. (This explanation of the <br />by VAC-NET after a site visit on November 16, 1995, and <br />5 This process <br />behind a bulkhead. The <br />aad ribs of the edit to rem <br />water 11 be introduced tc <br />describe above. <br />6 COIv1, Inc. i <br />redepos' ed tailings in the <br />waters rage capacity as ; <br />7 Any spillage <br />be coma ed immediately <br />8 After the cli <br />surveye .Representative <br />every 2 feet and the leng <br />using a 1 vel survey. Frog <br />bulkhea can be calculate <br />Il be repeated until the tailings sands are removed from <br />tion end of the flexible tubing will be moved along the floor <br />all of the sands possible. If any remaia after this process, <br />:ate a new slurry and then sucked out using the process <br />to create a barrier using hay bales to contain the <br />rest sector of the tailings pond in order to retain as much <br />ailings or process water during the removal operation will <br />removed to the tailings pond. <br />t-out is complete, the edit behind the bulkhead will be <br />tight and width measurements will betaken approximately <br />will be measured. The grade of the floor will be measured <br />phis data, the approximate storage capacity behind the <br />The bulkhea will be reconstructed by replacing the boards which were <br />The plastic liner 'll be reattached to the back ofthe bulkhead, or replaced if <br />.The joints betty the bulkhead and the ribs will be caulked with waterproof <br />material and then aimed with a swimming pool sealant. <br />advise wheth~r this plan is acceptable to the Division at your earliest <br />trend, <br />21, 1995 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.