My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35264
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:19 PM
Creation date
11/23/2007 8:15:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
General Documents
Doc Date
8/19/1994
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section II -Revisions to the Permit <br />Subsequent to the proposed decision to approve the permit renewal request, Peabody Western Coal <br />Company has submitted and a Division decision has been made for the following revisions: <br />Technical Revision No. 26 was received by the Division on December 15, 1992, and deemed <br />complete on December 18, 1992. The revision application, in response to Stipulation No. 27 to the <br />Seneca II Mine permit, included the following: <br />Updated operations plan, revised prediction of probable hydrologic consequences, <br />demonstrations for existing small area exemptions/areas with alternative sediment <br />control measures, updated Wolf Creek Fill monitoring plan, and updated light use <br />and access road locations. <br />The revision was approved March 31, 1994. <br />Technical Revision No. 27 was received by the Division on January 19, 1993, and deemed complete <br />on January 28, 1993. The revision application, also in response to Stipulation No. 27, included a <br />revised reclamation cost estimate, and modified revegetation success determination methods and <br />standazds. The portion of the application relating to revegetation success standazds was later <br />removed. The remainder of the application was approved on May 4, 1994. <br />Minor Revision No. 39 was issued in the field on April 16, 1993. The revision allowed for <br />placement of a temporary topsoil windrow on the northeast edge of the Wolf Creek pit. <br />Minor Revision No. 40 was received by the Division on May 5, 1993, and deemed complete on May <br />14, 1993. The revision application was in response to Notice of Violation No. C-93-057, which <br />required extension of the approved disturbance azea boundary. The revision was approved on May <br />19, 1993. <br />Minor Revision No. 41 was received by the Division on June 28, 1993, and deemed complete on <br />July 9, 1993. The application was a request for relief from the requirement to construct a fence <br />around the PeCoCo impoundment. The revision was approved on July 14, 1993. <br />The following permitting action is currently under review: <br />Succession of Operator No. 1 was received by the Division on July 5, 1994. The application is a <br />request to transfer the permit from Peabody Coa] Company to Seneca Coal Company, a subsidiary <br />of Peabody Coal Company. <br />Seneca II Mine (C~P-0QS) August 19, 1994 <br />Midterm Review 4 "I7tiM Permit Term <br />
The URL can be used to link to this page
Your browser does not support the video tag.