Laserfiche WebLink
-62- <br />Stipulation No. 21 <br />IN THE EVENT THAT 7HE AERIAL PHOTOGRAMMETRIC MONUMENT SURVEYS FAIL <br />TO MEET THE STIPULATED ACCURACY CRITERIA, WECC SHALL UTILIZE <br />TRADITIONAL FIELD SURVEY TECHNIQUES TO ESTABLISH THE REASONS FOR <br />LACK OF CORRELATION. IF THE RESULTS CANNOT BE CORRELATED, WECC <br />SHALL RESUME TRADITIONAL FIELD SURVEY MONUMENT MONITORING, IN <br />COMPLIANCE WITH THE ACCURACY CRITERIA AND STANDARDS CONTAINED WITH <br />STIPULATION N0. 14. <br />Stipulation No 22 <br />THE DIVISION DIRECTS WECC TO SUBMIT REPORTS OF ITS SUBSIDENCE <br />MONITORING PROGRAM ON A SEMI-ANNUAL BASIS, COMMENCING ONE MONTH <br />AFTER THE INSTALLATION AND INITIAL SURVEYING OF THE SUBSIDENCE <br />MONUMENTS. FURTHER, DUE TO THE COMPLEXITY OF THE PERMIT AREA <br />GEOLOGY, PRESENCE OF LANDSLIDES AND STEEP SLOPES, AND SENSITIVE <br />HYDROLOGIC ELEMENTS, WECC IS DIRECTED TO SUBMIT A PROPOSED <br />SUBSIDENCE MONITORING <br />REPORT FORMAT TO THE DIVISION FOR APPROVAL. THIS REPORT FORMAT <br />SHOULD RECOGNIZE THE IMPORTANCE OF CONTINUAL UPDATE OF SUBSIDENCE <br />DATA INTERPRETATION, MONITORING OF GROUND WATER LEVELS AND SPRING <br />FLOWS, MONITORING OF MINE INFLOW, AND SUBSURFACE GROUND CONDITIONS <br />WHICH COULD BE CORRELATED TO SUBSIDENCE PREDICTION. THIS REPORT <br />FORMAT SHALL BE APPROVED BY THE DIVISION PRIOR TO THE COMMENCEMENT <br />OF EXTRACTION OF COAL WITHIN THE SUBSIDENCE TEST PANEL DESIGNATED <br />IN APPENDIX A TO WECC'S NOVEMBER, 1984 PERMIT REVISION APPLICATION <br />(PANEL 1W-1S). <br />Stipulation No. 23 <br />THE DIVISION DIRECTS WECC TO COMPLETE A DETAILED ANALYSIS OF THE <br />POTENTIAL EFFECTS OF SLOPE STABILITY UPON THE STABILITY OF THE <br />LANDSLIDE DEPOSIT LOCATED ABOVE THE TOWN OF SOMERSET, REFERENCED ON <br />PAGE 30 OF EXHIBIT 3.4.8.A OF THE REVISED PERMIT APPLICATION. WECC <br />SHALL INSTALL AND MONITOR AN APPROPRIATE SET OF MONUMENTS ON THE <br />LAND SLIDE DEPOSIT IN ORDER TO OBSERVE THE POTENTIAL DISPLACEMENT <br />OF THE LANDS FORM. THE DETAILED ANALYSIS SHALL BE COMPLETED AND <br />SUBMITTED TO THE DIVISION FOR REVIEW. NO PILLAR RECOVERY SHALL <br />OCCUR WITHIN THE AFFECTED PANELS PRIOR TO RECEIPT OF DIVISION <br />APPROVAL. IF SUBSIDENCE MONITORING EXPERIENCE OR THE DETAILED <br />STABILITY ANALYSIS INDICATES THAT SECONDARY EXTRACTION WOULD <br />ADVERSELY AFFECT THE STABILITY OF THE LANDSLIDE DEPOSIT ABOVE THE <br />TOWN OF SOMERSET, THEN WECC SHALL LIMIT THE EXTRACTION OF THESE <br />PANELS TO 50Y. THE AFFECTED PANELS ARE THE THREE NORTHERN MOST <br />PANELS TO THE WEST OF THE MAINS WITHIN SECTION 17. <br />