My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35149
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:16 PM
Creation date
11/23/2007 8:12:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
6/17/1985
Doc Name
Proposed Decision & Findings of Compliance for PR2
From
Permanent Waste Pile
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-61- <br />Stipulation No. 18 <br />THE SUBSIDENCE MONITORING NETWORK SHALL BE SURVEYED UTILIZING <br />CONVENTIONAL GROUND SURVEYING TECHNIQUES, DESIGNED TO ACHIEVE <br />HORIZONTAL ACCURACIES COMPLYING WITH THE U.S. DEPARTMENT OF <br />COMMERCE'S "SECOND ORDER, CLASS II" SURVEY STANDARDS, AND VERTICAL <br />ACCURACIES NO LESS THAN + 0.2 FEET. THIS GRID SHALL BE SURVEYED <br />TWICE PRIOR TO THE INITIATION OF SUBSIDENCE. IN CONJUNCTION WITH <br />THESE SURVEYS WECCC SHALL SELECT AND ESTABLISH A MINIMUM OF SIX <br />TRIANGULATION BENCH MARK MONUMENTS OUTSIDE THE AREA OF ANTICIPATED <br />SUBSIDENCE EFFECTS, FOR THE PURPOSE OF CORRELATION WITH AERIAL <br />PHOTOGRAMMETRIC POST-SUBSIDENCE SURVEYS. <br />Stipulation No. 19 <br />WECC HAS REQUESTED PERMISSION TO COMPLETE A PRE-SUBSIDENCE AERIAL <br />PHOTOGRAMMETRIC SURVEY OF THE SUBSIDENCE MONITORING GRID, FOR THE <br />PURPOSE OF CORRELATION WITH THE FIELD SURVEY RESULTS. IT IS WECC'S <br />INTENTION TO UTILIZE AERIAL PHOTOGRAMMETRIC METHODOLOGY TO MONITOR <br />POST-SUBSIDENCE MOVEMENTS OF THE SUBSIDENCE MONUMENTS. THE RESULTS <br />OF THE PRE-SUBSIDENCE FIELD AND AERIAL PHOTOGRAMMETRIC SURVEYS <br />SHALL BE COMPARED FOR EACH GRID MONUMENT. THE AERIAL SURVEY WILL <br />BE ACCEPTED AS ACCURATE AND WILL BE USED FOR SUBSEQUENT <br />POST-SUBSIDENCE MONITORING, IN THE EVENT THAT THE AERIAL <br />PHOTOGRAMMETRIC AND FIELD SURVEYS CORRELATE WITH AN AVERAGE SURVEY <br />POINT LOCATION DEVIATION OF LESS THAN 0.2 FEET VERTICALLY AND <br />HORIZONTALLY, WITH SURVEY POINT LOCATION DEVIATIONS OF LESS THAN <br />0.4 FEET VERTICALLY AND HORIZONTALLY FOR LESS THAN 95% OF THE <br />SURVEY POINTS, AND WITH NO SINGLE SURVEY POINT LOCATION DEVIATION <br />VERTICALLY OR HORIZONTALLY IN EXCESS OF 0.8 FEET. <br />Stipulation No. 20 <br />WECC HAS REQUESTED PERMISSION TO COMPLETE AERIAL PHOTOGRAMMETRIC <br />SURVEYS OF THE SUBSIDENCE MONITORING GRID SUBSEQUENT TO THE <br />INITIATION OF SUBSIDENCE, FOR THE PURPOSE OF MONITORING SUBSIDENCE <br />MONUMENT MOVEMENTS. THE ACCURACY OF THE AERIAL PHOTOGRAMMETRIC <br />SURVEYS SHALL BE DETERMINED BY A COMPARISON OF TRIANGULATION BENCH <br />MARK MONUMENT FIELD AND AERIAL PHOTOGRAMMETRIC SURVEY RESULTS <br />FOLLOWING EACH SEMI-ANNUAL SURVEY. THE RESULTS OF EACH AERIAL <br />PHOTOGRAMMETRIC SURVEY SHALL BE ACCEPTED AS ACCURATE, IN THE EVENT <br />THAT THE AERIAL PHOTOGRAMMETRIC AND MOST RECENT ANNUAL <br />TRIANGULATION MONUMENT FIELD SURVEY RESULTS CORRELATE WITH AN <br />AVERAGE TRIANGULATION MONUMENT LOCATION DEVIATION OF LESS THAN 0.2 <br />FEET VERTICALLY AND HORIZONTALLY, WITH TRIANGULATION MONUMENT <br />LOCATION DEVIATIONS OF LESS THAN 0.4 FEET VERTICALLY AND <br />HORIZONTALLY FOR LESS THAN 83% OF THE TRIANGULATION MONUMENTS, AND <br />WITH NO SINGLE TRIANGULATION POINT LOCATION DEVIATION VERTICALLY OR <br />HORIZONTALLY IN EXCESS OF 0.8 FEET. <br />
The URL can be used to link to this page
Your browser does not support the video tag.